Monday, June 23, 2025
  • Contact
  • About us
  • Advertise
  • Careers
  • Privacy Policy
Gadyal Kashmir
  • Home
  • Kashmir
  • Jammu
  • World
  • National
  • Sports
  • Article
  • ePaper
No Result
View All Result
Gadyal Kashmir
Home Home

J&K, Punjab team inspects Shahpur Kandi Dam Project; Emphasizes expeditious execution for timely completion

Gadyal Desk by Gadyal Desk
16/06/2021
A A
J&K, Punjab team inspects Shahpur Kandi Dam Project; Emphasizes expeditious execution for timely completion
FacebookTwitterWhatsappTelegram

SRINAGAR, JUNE 16: A joint high level team comprising officers both from Jammu and Kashmir and Punjab today inspected various components of Shahpur Kandi Dam Project to ensure expeditious execution of ongoing works on this prestigious project.

The officers from J&K led by Chairperson, Jammu and Kashmir Water Resources Regulatory Authority (JKWRRA), G.S. Jha included Chief Engineer RTIC Jammu, Himesh Manchanda, Superintending Engineer RTIC Jammu, Ajay Gupta, Superintending Engineer, Jammu and Kashmir Water Resources Regulatory Authority, Anil Kumar and Assistant Commissioner (Revenue), Kathua, Sandeep Seointra while General Manager (Dams), S.K. Saluja, Chief Engineer (Dams), R.D. Sawa, Chief Engineer, M.K. Jain and Superintending Engineer (Dams), B. S. Sandhu represented the Shahpur Kandi Dam Project, Punjab.

Related posts

India’s Solodarity with people POJK

وادی کشمیر میں وقف اثاثوں کی صحیح نگرانی اور ترقی ناگزیر

19/04/2025

پاکستانی پروپیگنڈا وزیرِ اعظم نریندر مودی کے دورۂ کشمیر کے دوران: سوشل میڈیا کا تجزیہ

17/01/2025

The team conducted extensive inspection of ongoing works on Ravi Canal at Basantpur, Shahpur Kandi Barrage and Hydel Channel on the Punjab side besides visiting off-take site of BP Canal from the existing Ravi Tawi Canal and the head works of the Kashmir Canal.

Pertinently, the project coming up at a cost of Rs. 2715.70 crore is of utmost importance for the Union Territory as it will give a discharge of 1150 cusecs to J&K which shall bring about 32173 hectare of land under irrigation in the districts of Kathua and Samba which in turn shall improve the socio-economic conditions of the people related to agriculture and allied sectors.

Chairperson JKWRRA stressed for expediting the pace of progress on all ongoing works for timely completion of the project.

Meanwhile, the officers also held a meeting and discussed the issues threadbare to speed up the works, remove bottlenecks and resolve the land related matters for timely completion of the project.

Assistant Commissioner (Revenue), Kathua, was directed to submit the cases of land compensation at the earliest.

Gadyal Desk
Gadyal Desk
Previous Post

DC Srinagar briefs Media on present Covid-19 situation

Next Post

53% active positive cases are from micro containment zones in Ganderbal: DC Briefs media on current Covid scenario in district

Related Posts

India’s Solodarity with people POJK
Home

وادی کشمیر میں وقف اثاثوں کی صحیح نگرانی اور ترقی ناگزیر

by Gadyal Desk
19/04/2025
0

وقف املاک نہ کسی مذہبی لیڈر کی ملکیت ہوتی ہے اور ناہی کسی خاص انجمن کی ملکیت ہے بلکہ یہ...

Read more

پاکستانی پروپیگنڈا وزیرِ اعظم نریندر مودی کے دورۂ کشمیر کے دوران: سوشل میڈیا کا تجزیہ

17/01/2025
THE CALL OF THE MOUNTAINS NORTH KASHMIR’S NEW FRONTIERS FOR ADVENTURE SEEKERS

گریز وادی کشمیر کی تہذیب اور کلچر کی پہنچان

09/01/2025
قاضی سلمان کو ڈائریکٹر، پی آئی بی سرینگر کے بطور ترقی سے نوازا گیا

قاضی سلمان کو ڈائریکٹر، پی آئی بی سرینگر کے بطور ترقی سے نوازا گیا

09/01/2025
بانڈی پورہ میں عوام کی بہادری: زخمی فوجیوں کی مدد سے کشمیریت کی مثال قائم

بانڈی پورہ میں عوام کی بہادری: زخمی فوجیوں کی مدد سے کشمیریت کی مثال قائم

05/01/2025
Next Post
DC Gbl briefs on achievements, preparations to combat second wave of Covid-19

53% active positive cases are from micro containment zones in Ganderbal: DC Briefs media on current Covid scenario in district

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

  • Contact
  • About us
  • Advertise
  • Careers
  • Privacy Policy
e-mail: [email protected]

© 2022 Gadyal - Designed and Developed by GITS.

No Result
View All Result
  • Home
  • Kashmir
  • Jammu
  • World
  • National
  • Sports
  • Article
  • ePaper

© 2022 Gadyal - Designed and Developed by GITS.