Monday, August 3, 2026
  • About us
  • Contact
  • Our Team
  • Advertise
  • Careers
  • Privacy Policy
Gadyal Kashmir
  • Home
  • Kashmir
  • Jammu
  • World
  • National
  • Sports
  • Article
  • ePaper
No Result
View All Result
Gadyal Kashmir
Home Home

Div Com reviews progress on Manasbal Lake Development project under PMDP Stresses on work expedition on Island, other projects

Gadyal Desk by Gadyal Desk
08/02/2021
A A
Div Com reviews progress on Manasbal Lake Development project under PMDP  Stresses on work expedition on Island, other projects
FacebookTwitterWhatsappTelegram

SRINAGAR, FEBRUARY 08: The Divisional Commissioner (Div Com) Kashmir, Pandurang K Pole today chaired a meeting of officers to take stock of the progress made in the execution of Manasbal Lake development project under PMDP.

The meeting, among others was attended by Deputy Commissioner Ganderbal, Shafqat Iqbal (through videoconferencing), CE I&FC, Director RDD, CEO WMDA, ACD Ganderbal, Tehsildar Lar and other concerned.

Related posts

Union Education Minister Dharmendra Pradhan Resigns

Education Minister Dharmendra Pradhan Resigns Amid NEET-UG Row, Sends Resignation Letter to PM Modi

25/07/2026
Kargil Vijay Diwas: An Eternal Saga of Bravery, Sacrifice, and National Resolve

Kargil Vijay Diwas: An Eternal Saga of Bravery, Sacrifice, and National Resolve

25/07/2026

At the outset, the Div Com instructed concerned to pace up the work process on the development of the island inside the lake along with construction of a wooden bridge.

He emphasized on work completion of pending pathway construction and related works adjacent to Manasbal Lake.

Instructions were issued to the concerned Revenue officers to conduct a demarcation drive, mutation and acquiring of land for the pathway construction.

The Div Com said that flow of sewerage should be stopped into the lake by locals and impressed upon the concerned to provide toilets, septic tanks and waste management pits to all households living within the 100 meters periphery of the lake. He instructed concerned to take up the works under SBM and MGNREGA schemes on priority.

He further emphasized on identifying the land for rehabilitation of Manasbal dwellers to relocate affected families on war footing.

Previous Post

DDC Shopian reviews progress of ongoing developmental projects

Next Post

06 cases settled under SDRF during DDMC meet at Kupwara

Gadyal Desk

Gadyal Desk

Related Posts

Union Education Minister Dharmendra Pradhan Resigns
Home

Education Minister Dharmendra Pradhan Resigns Amid NEET-UG Row, Sends Resignation Letter to PM Modi

by Gadyal Desk
25/07/2026
0

New Delhi, July 25 (JKNS): Union Education Minister Dharmendra Pradhan on Saturday announced that he has submitted his resignation to...

Read more
Kargil Vijay Diwas: An Eternal Saga of Bravery, Sacrifice, and National Resolve

Kargil Vijay Diwas: An Eternal Saga of Bravery, Sacrifice, and National Resolve

25/07/2026
DRDO conducts successful maiden flight-test of ‘Kusha’ Long-Range Surface-to-Air Missile

DRDO conducts successful maiden flight-test of ‘Kusha’ Long-Range Surface-to-Air Missile

24/07/2026
DGP Anurag Dhankar Found Dead at Agartala Police Headquarters; Probe Underway

DGP Anurag Dhankar Found Dead at Agartala Police Headquarters; Probe Underway

20/07/2026
India’s Solodarity with people POJK

وادی کشمیر میں وقف اثاثوں کی صحیح نگرانی اور ترقی ناگزیر

19/04/2025
Next Post
06 cases settled under SDRF during DDMC meet at Kupwara

06 cases settled under SDRF during DDMC meet at Kupwara

  • About us
  • Contact
  • Our Team
  • Advertise
  • Careers
  • Privacy Policy
e-mail: [email protected]

© 2022 Gadyal - Designed and Developed by GITS.

No Result
View All Result
  • Home
  • Kashmir
  • Jammu
  • World
  • National
  • Sports
  • Article
  • ePaper

© 2022 Gadyal - Designed and Developed by GITS.