Tuesday, August 11, 2026
  • About us
  • Contact
  • Our Team
  • Advertise
  • Careers
  • Privacy Policy
Gadyal Kashmir
  • Home
  • Kashmir
  • Jammu
  • World
  • National
  • Sports
  • Article
  • ePaper
No Result
View All Result
Gadyal Kashmir
Home Home

Cabinet approves implementation of the Pradhan Mantri Gram Sadak Yojana – IV (PMGSY-IV) during FY 2024-25 to 2028-29

Gadyal Desk by Gadyal Desk
11/09/2024
A A
Cabinet approves implementation of the Pradhan Mantri Gram Sadak Yojana – IV (PMGSY-IV) during FY 2024-25 to 2028-29
FacebookTwitterWhatsappTelegram

Total outlay of the scheme will be Rs.70,125 crore

25,000 unconnected habitations and construction/upgradation of bridges on new connectivity roads
Posted On: 11 SEP 2024 8:16PM by PIB Delhi
The Union Cabinet, chaired by the Prime Minister Shri Narendra Modi, today approved the proposal of the Department of Rural Development for “Implementation of the Pradhan Mantri Gram Sadak Yojana – IV (PMGSY-IV) during FY 2024-25 to 2028-29”.

Related posts

National Flag of India Quiz Draws Strong Response; 9 Days Left to Participate

National Flag of India Quiz Draws Strong Response; 9 Days Left to Participate

06/08/2026
Union Education Minister Dharmendra Pradhan Resigns

Education Minister Dharmendra Pradhan Resigns Amid NEET-UG Row, Sends Resignation Letter to PM Modi

25/07/2026

The financial assistance is to be provided for the construction of 62,500 Kms road for providing new connectivity to eligible 25,000 unconnected habitations and construction/upgradation of bridges on the new connectivity roads. Total outlay of this scheme will be Rs. 70,125 crore.

Details of the Scheme:

The details of the approval given by the Cabinet are as follows:

i. Pradhan Mantri Gram Sadak Yojana -IV is launched for financial year 2024-25 to 2028-29. Total outlay of this scheme is Rs. 70,125 crore (Central Share of Rs. 49,087.50 crore and Sate Share of Rs. 21,037.50 crore).

ii. Under this scheme 25,000 unconnected habitations of population size 500+ in plains, 250+ in NE & Hill Sates/UTs, special category areas (Tribal Schedule V, Aspirational Districts/Blocks, Desert areas) and 100+ in LWE affected districts, as per Census 2011 will be covered.

iii. Under this scheme 62,500 Km of all-weather roads will be provided to unconnected habitations. Construction of required bridges along the alignment of the all-weather road will also be provided.

Benefits:

25,000 unconnected habitations will be provided all weather road connectivity.
The all-weather roads will play the role of catalysts for the required socio-economic development and transformation of the remote rural areas. While connecting habitations, the nearby government educational, health, market, growth centers will be connected, as far as feasible, with the all-weather road for the benefit of the local people.
The PMGSY -IV will incorporate international benchmarks and best practices under road constructions such as Cold Mix Technology and Waste Plastic, Panelled Cement concrete, Cell filled concrete, Full Depth Reclamation, use of construction waste and other wastes such as Fly Ash, Steel Slag, etc.
PMGSY -IV road alignment planning will be undertaken through the PM Gati Shakti portal. The planning tool on PM Gati Shakti portal will also assist in DPR preparation.

Previous Post

Cabinet approves ‘Mission Mausam’ to create a more weather-ready and climate-smart Bharat with an outlay of Rs.2,000 crore over two years

Next Post

Cabinet approves PM Electric Drive Revolution in Innovative Vehicle Enhancement (PM E-DRIVE) Scheme with an outlay of Rs.10,900 crore over a period of two years

Gadyal Desk

Gadyal Desk

Related Posts

National Flag of India Quiz Draws Strong Response; 9 Days Left to Participate
Home

National Flag of India Quiz Draws Strong Response; 9 Days Left to Participate

by Gadyal Desk
06/08/2026
0

New Delhi, Aug 6 (JKNS): The Department of Youth Affairs, through MY Bharat, has called upon young citizens to participate...

Read more
Union Education Minister Dharmendra Pradhan Resigns

Education Minister Dharmendra Pradhan Resigns Amid NEET-UG Row, Sends Resignation Letter to PM Modi

25/07/2026
Kargil Vijay Diwas: An Eternal Saga of Bravery, Sacrifice, and National Resolve

Kargil Vijay Diwas: An Eternal Saga of Bravery, Sacrifice, and National Resolve

25/07/2026
DRDO conducts successful maiden flight-test of ‘Kusha’ Long-Range Surface-to-Air Missile

DRDO conducts successful maiden flight-test of ‘Kusha’ Long-Range Surface-to-Air Missile

24/07/2026
DGP Anurag Dhankar Found Dead at Agartala Police Headquarters; Probe Underway

DGP Anurag Dhankar Found Dead at Agartala Police Headquarters; Probe Underway

20/07/2026
Next Post
Cabinet approves PM Electric Drive Revolution in Innovative Vehicle Enhancement  (PM E-DRIVE) Scheme with an outlay of Rs.10,900 crore over a period of two years

Cabinet approves PM Electric Drive Revolution in Innovative Vehicle Enhancement (PM E-DRIVE) Scheme with an outlay of Rs.10,900 crore over a period of two years

  • About us
  • Contact
  • Our Team
  • Advertise
  • Careers
  • Privacy Policy
e-mail: [email protected]

© 2022 Gadyal - Designed and Developed by GITS.

No Result
View All Result
  • Home
  • Kashmir
  • Jammu
  • World
  • National
  • Sports
  • Article
  • ePaper

© 2022 Gadyal - Designed and Developed by GITS.