Tuesday, June 23, 2026
  • About us
  • Contact
  • Our Team
  • Advertise
  • Careers
  • Privacy Policy
Gadyal Kashmir
  • Home
  • Kashmir
  • Jammu
  • World
  • National
  • Sports
  • Article
  • ePaper
No Result
View All Result
Gadyal Kashmir
Home Home

Div Com calls for expeditious completion of infrastructure works at Machail Mata Shrine; reviews arrangements for Annual Yatra

Gadyal Desk by Gadyal Desk
07/04/2022
A A
FacebookTwitterWhatsappTelegram

Shrine area likely to have Power, telecom services by May end

JAMMU, APRIL 07: Divisional Commissioner, Jammu Dr Raghav Langer today chaired a meeting of concerned officers to review the progress of development works at Machail Mata ji Shrine and also reviewed the arrangements put in place for smooth conduct of Annual Yatra to the Shrine.

Related posts

India’s Solodarity with people POJK

وادی کشمیر میں وقف اثاثوں کی صحیح نگرانی اور ترقی ناگزیر

19/04/2025

پاکستانی پروپیگنڈا وزیرِ اعظم نریندر مودی کے دورۂ کشمیر کے دوران: سوشل میڈیا کا تجزیہ

17/01/2025

The meeting was attended by Deputy Commissioner Kishtwar, Ashok Sharma; Director Tourism, Vivekanand Rai; Additional DC Jammu, Syambir Singh; Deputy CEO, Shri Mata Vaishno Devi ji Shrine Board, Vishvajeet Singh; Chief Engineers of JPDCL, PWD, PMGSY besides senior functionaries of Reliance, Airtel and other concerned officers while Deputy Commissioner Doda, District officers of Kishtwar participated in the meeting through video conferencing.

At the outset, the Divisional Commissioner inquired about the overall infrastructure development requirements. The Deputy Commissioner Kishtwar apprised him of progress achieved so far and future work plan.

It was informed that in compliance of High Court Judgment various Chandi Mata Shrines, temples are to be taken over by administration to further entrust the management to one of existing Shrine Boards. The Chandi Mata temples included Machail Mata Shrine, Chandi Mata temples at Bhaderwah of Doda district, temples at Dhami and Pacca Danga in district Jammu.

The Div Com directed the concerned District Administrations  to constitute  committees for inventorisation & to review the existing management and take over the same.

While reviewing annual Yatra arrangements which generally start from July 25, it was informed that varied works have been initiated for development of basic facilities, roads, power supply, buildings etc in the Shrine area.

The Div Com took strong note of sluggish pace of work on PMGSY project and directed the Superintendent Engineer to complete the same for smooth conduct of Yatra.

Regarding power supply facility, the Chief Engineer JPDCL informed that the work was in progress and the area will get the facility by ending April.

Asking for dependable telecom services for pilgrims, the Div Com stressed on the district administration to facilitate  the work on installation of towers, resolve land issues, power supply etc.

It was informed that a website portal/ mobile app will be launched for registration of pilgrims and to provide all the information related to Shri Chandi Mata Ji Machail Yatra and its history.

Chief Engineer PWD (R&B) informed that DPRs have been prepared for the construction/repair of Dharamshala, Renovation of existing toilets en-route to Shrine and other additional works.

The Div Com instructed the concerned officers to  immediately float tenders to ensure that these infrastructural development works are completed before the start of Yatra.

Dr Langer also exhorted upon DC Kishtwar, other concerned officers to explore provisions of installation of solar lights, CCTV’s on entire  route.

He further called for introducing RFID tracking     for the pilgrims visiting Machail Mata this year to ensure their safety.

He directed district administration Kishtwar to identify locations for tracking zones, installation of PTZ cameras, setting up of control room.

Previous Post

Yasha Mudgal inspects ongoing modernization work of Super Bazar Jammu, reviews working of Co-operative department

Next Post

Police arrests terrorist associate of proscribed terror outfit LeT in Baramulla

Gadyal Desk

Gadyal Desk

Related Posts

India’s Solodarity with people POJK
Home

وادی کشمیر میں وقف اثاثوں کی صحیح نگرانی اور ترقی ناگزیر

by Gadyal Desk
19/04/2025
0

وقف املاک نہ کسی مذہبی لیڈر کی ملکیت ہوتی ہے اور ناہی کسی خاص انجمن کی ملکیت ہے بلکہ یہ...

Read more

پاکستانی پروپیگنڈا وزیرِ اعظم نریندر مودی کے دورۂ کشمیر کے دوران: سوشل میڈیا کا تجزیہ

17/01/2025
THE CALL OF THE MOUNTAINS NORTH KASHMIR’S NEW FRONTIERS FOR ADVENTURE SEEKERS

گریز وادی کشمیر کی تہذیب اور کلچر کی پہنچان

09/01/2025
قاضی سلمان کو ڈائریکٹر، پی آئی بی سرینگر کے بطور ترقی سے نوازا گیا

قاضی سلمان کو ڈائریکٹر، پی آئی بی سرینگر کے بطور ترقی سے نوازا گیا

09/01/2025
بانڈی پورہ میں عوام کی بہادری: زخمی فوجیوں کی مدد سے کشمیریت کی مثال قائم

بانڈی پورہ میں عوام کی بہادری: زخمی فوجیوں کی مدد سے کشمیریت کی مثال قائم

05/01/2025
Next Post
Police arrests terrorist associate of proscribed terror outfit LeT in Baramulla

Police arrests terrorist associate of proscribed terror outfit LeT in Baramulla

  • About us
  • Contact
  • Our Team
  • Advertise
  • Careers
  • Privacy Policy
e-mail: [email protected]

© 2022 Gadyal - Designed and Developed by GITS.

No Result
View All Result
  • Home
  • Kashmir
  • Jammu
  • World
  • National
  • Sports
  • Article
  • ePaper

© 2022 Gadyal - Designed and Developed by GITS.