Monday, August 3, 2026
  • About us
  • Contact
  • Our Team
  • Advertise
  • Careers
  • Privacy Policy
Gadyal Kashmir
  • Home
  • Kashmir
  • Jammu
  • World
  • National
  • Sports
  • Article
  • ePaper
No Result
View All Result
Gadyal Kashmir
Home Home

Div Com Kashmir inspects work progress on STPs in Srinagar

Gadyal Desk by Gadyal Desk
27/08/2021
A A
Div Com Kashmir inspects work progress on STPs in Srinagar
FacebookTwitterWhatsappTelegram

Stresses on speedy completion of ongoing works for arrest of sewerage

SRINAGAR, AUGUST 27: The Divisional Commissioner (Div Com) Kashmir, Pandurang K Pole today conducted an extensive tour of Srinagar to take stock of the pace and progress of ongoing STP projects.

Related posts

Union Education Minister Dharmendra Pradhan Resigns

Education Minister Dharmendra Pradhan Resigns Amid NEET-UG Row, Sends Resignation Letter to PM Modi

25/07/2026
Kargil Vijay Diwas: An Eternal Saga of Bravery, Sacrifice, and National Resolve

Kargil Vijay Diwas: An Eternal Saga of Bravery, Sacrifice, and National Resolve

25/07/2026

The Div Com was accompanied by Deputy Commissioner Srinagar, Mohammad Aijaz Assad, GM NBCC, SE UEED Srinagar Circle and other concerned officers.

During the tour, Pole inspected the proposed Inter Mediate Pumping Station (IPS), Zero Bridge Rajbagh, IPS Vicharnag Nowshehra, STP Noorbagh, IPS Saidpora, Alijan Road and Outfall Pumping Station Noorbagh.

He also inspected STP related works in Alamgari Bazar and other localities of Old City.

While taking stock of progress of works, Div Com stressed on speedy completion of all projects and instructed concerned authorities to ensure timely resolution of issues including land transfers, land acquisition for pipe laying, electricity and other facilities impeding the work process.

He emphasized that pace of work is expedited on all STP related projects in Srinagar for arrest of sewerage in all city areas.

The Div Com was apprised that work on STP Noorbagh, IPS and outfall stations was going on in full swing, which is to be made functional by end of the current year.

During the tour, Div Com met locals at Noorbagh, who apprised him of various issues including construction of drainage and roads in the area.

He gave them a hearing and assured that all their genuine demands shall be looked into on priority.

Previous Post

JKBOSE reduces syllabus by 40% for classes 10th, 11th,12th annual private Exams

Next Post

MD, NHIDCL inspects works on Zojila, Z-morh tunnel projects in Ganderbal

Gadyal Desk

Gadyal Desk

Related Posts

Union Education Minister Dharmendra Pradhan Resigns
Home

Education Minister Dharmendra Pradhan Resigns Amid NEET-UG Row, Sends Resignation Letter to PM Modi

by Gadyal Desk
25/07/2026
0

New Delhi, July 25 (JKNS): Union Education Minister Dharmendra Pradhan on Saturday announced that he has submitted his resignation to...

Read more
Kargil Vijay Diwas: An Eternal Saga of Bravery, Sacrifice, and National Resolve

Kargil Vijay Diwas: An Eternal Saga of Bravery, Sacrifice, and National Resolve

25/07/2026
DRDO conducts successful maiden flight-test of ‘Kusha’ Long-Range Surface-to-Air Missile

DRDO conducts successful maiden flight-test of ‘Kusha’ Long-Range Surface-to-Air Missile

24/07/2026
DGP Anurag Dhankar Found Dead at Agartala Police Headquarters; Probe Underway

DGP Anurag Dhankar Found Dead at Agartala Police Headquarters; Probe Underway

20/07/2026
India’s Solodarity with people POJK

وادی کشمیر میں وقف اثاثوں کی صحیح نگرانی اور ترقی ناگزیر

19/04/2025
Next Post
MD, NHIDCL inspects works on Zojila, Z-morh tunnel projects in Ganderbal

MD, NHIDCL inspects works on Zojila, Z-morh tunnel projects in Ganderbal

  • About us
  • Contact
  • Our Team
  • Advertise
  • Careers
  • Privacy Policy
e-mail: [email protected]

© 2022 Gadyal - Designed and Developed by GITS.

No Result
View All Result
  • Home
  • Kashmir
  • Jammu
  • World
  • National
  • Sports
  • Article
  • ePaper

© 2022 Gadyal - Designed and Developed by GITS.