Saturday, July 5, 2025
  • Contact
  • About us
  • Advertise
  • Careers
  • Privacy Policy
Gadyal Kashmir
  • Home
  • Kashmir
  • Jammu
  • World
  • National
  • Sports
  • Article
  • ePaper
No Result
View All Result
Gadyal Kashmir
Home Home

Land acquisition, improvement work on Srinagar- Baramulla-Uri NH Project to be expedited: Secretary Planning

Gadyal Desk by Gadyal Desk
27/09/2022
A A
FacebookTwitterWhatsappTelegram

SRINAGAR, SEPTEMBER 27: Secretary, Planning Development and Monitoring Department, Dr Raghav Langer today took a review meeting regarding progress of Srinagar-Baramulla-Uri National Highway Project in District Baramulla, along with Deputy Commissioner Baramulla and Officers of Border Roads Organization.

Secretary Planning, who is also the Mentor Secretary for district Baramulla, mentioned that the instant project is having strategic importance and stressed that all efforts shall be put in for its timely completion without compromising the work quality and all bottlenecks shall be removed for its timely completion.

Related posts

India’s Solodarity with people POJK

وادی کشمیر میں وقف اثاثوں کی صحیح نگرانی اور ترقی ناگزیر

19/04/2025

پاکستانی پروپیگنڈا وزیرِ اعظم نریندر مودی کے دورۂ کشمیر کے دوران: سوشل میڈیا کا تجزیہ

17/01/2025

A detailed power point presentation was given by the Lt. Col. Jitender Singh, OC, 53 RCC Project Beacon in which he mentioned that Job for preparation of DPR for improvement of Road Srinagar-Baramulla-Uri (NH-1) from km 14.200 (Narbal) to km 57.800 to NHFL specification and from km 57.800 to km 101.00 to NHDL with paved shoulder has already been sanctioned in 04 packages by MoRTH. Commander, BRTF of Project Beacon apprised the Secretary Planning that the project is on track but there are some issues pertaining to land acquisition which need to be resolved. He said that in few cases, estimates of tree compensation from Horticulture Department and assessment of valuation of structures from R&B Department are awaited, besides compensation disbursement needs to be expedited by the Collector/CALA esp along the stretches of Sangrama flyover, Pattan bypass & Baramulla bypass.

Deputy Commissioner Baramulla assured that the estimates of Horticulture and R&B Department shall be furnished within couple of days, meanwhile DC stressed that an immediate action is required to be taken by BRO vis-à-vis road widening, berm filling, construction of passenger sheds and drainage which otherwise become the main cause of traffic jam esp in the Baramulla Town. For compensation disbursement, Deputy Commissioner intimated that the cases are being evaluated on war footing basis and every possible effort is made to finish the process as soon as possible so that land compensation is disbursed efficiently.

The Secretary Planning impressed that if there are any policy related issues, wherein some clarity is required at the Government level, same may be forwarded to the Revenue Department for their earlier resolution. Further, all pending 3G Awards shall be notified within a period of 15 days.

At the end, the Secretary Planning, Development and Monitoring Department directed all concerned to work in harmony and coordination so that all bottlenecks are removed and the project shall be got completed within stipulated period of time so that general public may feel at ease for commuting on this stretch of National Highway, without loss of time.

Gadyal Desk
Gadyal Desk
Previous Post

CS reviews power sector in J&K

Next Post

امسال کشمیر میں سیاحوں کی تعداد میں غیر معمولی اضافہ، پچھلے 15برسوں کا ریکارڈ ٹوٹ گیا

Related Posts

India’s Solodarity with people POJK
Home

وادی کشمیر میں وقف اثاثوں کی صحیح نگرانی اور ترقی ناگزیر

by Gadyal Desk
19/04/2025
0

وقف املاک نہ کسی مذہبی لیڈر کی ملکیت ہوتی ہے اور ناہی کسی خاص انجمن کی ملکیت ہے بلکہ یہ...

Read more

پاکستانی پروپیگنڈا وزیرِ اعظم نریندر مودی کے دورۂ کشمیر کے دوران: سوشل میڈیا کا تجزیہ

17/01/2025
THE CALL OF THE MOUNTAINS NORTH KASHMIR’S NEW FRONTIERS FOR ADVENTURE SEEKERS

گریز وادی کشمیر کی تہذیب اور کلچر کی پہنچان

09/01/2025
قاضی سلمان کو ڈائریکٹر، پی آئی بی سرینگر کے بطور ترقی سے نوازا گیا

قاضی سلمان کو ڈائریکٹر، پی آئی بی سرینگر کے بطور ترقی سے نوازا گیا

09/01/2025
بانڈی پورہ میں عوام کی بہادری: زخمی فوجیوں کی مدد سے کشمیریت کی مثال قائم

بانڈی پورہ میں عوام کی بہادری: زخمی فوجیوں کی مدد سے کشمیریت کی مثال قائم

05/01/2025
Next Post
امسال کشمیر میں سیاحوں کی تعداد میں غیر معمولی اضافہ، پچھلے 15برسوں کا ریکارڈ ٹوٹ گیا

امسال کشمیر میں سیاحوں کی تعداد میں غیر معمولی اضافہ، پچھلے 15برسوں کا ریکارڈ ٹوٹ گیا

  • Contact
  • About us
  • Advertise
  • Careers
  • Privacy Policy
e-mail: [email protected]

© 2022 Gadyal - Designed and Developed by GITS.

No Result
View All Result
  • Home
  • Kashmir
  • Jammu
  • World
  • National
  • Sports
  • Article
  • ePaper

© 2022 Gadyal - Designed and Developed by GITS.