Monday, August 3, 2026
  • About us
  • Contact
  • Our Team
  • Advertise
  • Careers
  • Privacy Policy
Gadyal Kashmir
  • Home
  • Kashmir
  • Jammu
  • World
  • National
  • Sports
  • Article
  • ePaper
No Result
View All Result
Gadyal Kashmir
Home Home

DC G’bl inspects work progress on Zojila, Z-Morh tunnel

Gadyal Desk by Gadyal Desk
29/05/2021
A A
DC Gbl briefs on achievements, preparations to combat second wave of Covid-19
FacebookTwitterWhatsappTelegram

Work on Z-morh escape tunnel nearing completion

GANDERBAL, MAY 29: The Deputy Commissioner (DC) Ganderbal, Krittika Jyotsna today visited the construction site of  Z-Morh and Zojila tunnel at Sonamarg to have first-hand appraisal of the work progress made on the tunnel.

Related posts

Union Education Minister Dharmendra Pradhan Resigns

Education Minister Dharmendra Pradhan Resigns Amid NEET-UG Row, Sends Resignation Letter to PM Modi

25/07/2026
Kargil Vijay Diwas: An Eternal Saga of Bravery, Sacrifice, and National Resolve

Kargil Vijay Diwas: An Eternal Saga of Bravery, Sacrifice, and National Resolve

25/07/2026

The DC during the visit was accompanied by Gurjeet Singh Kambo, Executive Director, NHIDCL, besides officials of MEIL and ASATPL.

During  the visit, the DC inspected the ongoing work on the 40 Km project with 2 major tunnels of 6.5 KM and 14 KM for all weather connectivity to Sonamarg and Ladakh  and was briefed about the pace and progress made on the project.

On the occasion it was informed that work progress on the project is in full swing and work on Z-morh escape tunnel is nearing completion.

Jyotsna directed the officials of the executing agency to expedite the pace of work on the ambitious project so that targets are achieved within the stipulated time frame. She also directed the concerned to closely monitor all the construction/planning activities.

Meanwhile, the DC also chaired a meeting with the officials of the executing agency during which certain administrative issues were discussed.  She assured of all possible support  besides handling of bottlenecks if any expeditiously by District administration.

The DC also enquired about the recruitment of local unemployed youth in the prestigious project and urged upon the concerned to provide maximum job opportunities to the locals as per the norms in Zojila tunnel works.

Earlier, a blasting ceremony was also  carried out by the Deputy Commissioner at Z-Morh tunnel.

The 14 km long Zojila tunnel once completed will facilitate all weather road connectivity between Srinagar and Kargil which mainly remains closed during winter due to heavy snowfall in the area and will reduce travel time also.

The tunnel will also benefit social and economic development of the region apart from boosting the tourism in Sonamarg region as well as Ladakh region.

Previous Post

JK Finance Employees Association condoles demise of AAO, LAWDA

Next Post

Adhere to Covid-19 SOPs, guidelines both during lockdown/ unlock periods: DC Shopian

Gadyal Desk

Gadyal Desk

Related Posts

Union Education Minister Dharmendra Pradhan Resigns
Home

Education Minister Dharmendra Pradhan Resigns Amid NEET-UG Row, Sends Resignation Letter to PM Modi

by Gadyal Desk
25/07/2026
0

New Delhi, July 25 (JKNS): Union Education Minister Dharmendra Pradhan on Saturday announced that he has submitted his resignation to...

Read more
Kargil Vijay Diwas: An Eternal Saga of Bravery, Sacrifice, and National Resolve

Kargil Vijay Diwas: An Eternal Saga of Bravery, Sacrifice, and National Resolve

25/07/2026
DRDO conducts successful maiden flight-test of ‘Kusha’ Long-Range Surface-to-Air Missile

DRDO conducts successful maiden flight-test of ‘Kusha’ Long-Range Surface-to-Air Missile

24/07/2026
DGP Anurag Dhankar Found Dead at Agartala Police Headquarters; Probe Underway

DGP Anurag Dhankar Found Dead at Agartala Police Headquarters; Probe Underway

20/07/2026
India’s Solodarity with people POJK

وادی کشمیر میں وقف اثاثوں کی صحیح نگرانی اور ترقی ناگزیر

19/04/2025
Next Post
Adhere to Covid-19 SOPs, guidelines both during lockdown/ unlock periods: DC Shopian

Adhere to Covid-19 SOPs, guidelines both during lockdown/ unlock periods: DC Shopian

  • About us
  • Contact
  • Our Team
  • Advertise
  • Careers
  • Privacy Policy
e-mail: [email protected]

© 2022 Gadyal - Designed and Developed by GITS.

No Result
View All Result
  • Home
  • Kashmir
  • Jammu
  • World
  • National
  • Sports
  • Article
  • ePaper

© 2022 Gadyal - Designed and Developed by GITS.