Tuesday, June 23, 2026
  • About us
  • Contact
  • Our Team
  • Advertise
  • Careers
  • Privacy Policy
Gadyal Kashmir
  • Home
  • Kashmir
  • Jammu
  • World
  • National
  • Sports
  • Article
  • ePaper
No Result
View All Result
Gadyal Kashmir
Home Jammu Kashmir Jammu

R&B Pakherpora Refutes Claims of Private Machinery Use for Snow Clearance at Chelyan-Chontinar

Tanveer Hussain by Tanveer Hussain
29/01/2026
A A
R&B Pakherpora Refutes Claims of Private Machinery Use for Snow Clearance at Chelyan-Chontinar
FacebookTwitterWhatsappTelegram

Budgam, Jan 29 (JKNS): The Assistant Executive Engineer, R&B Sub Division Pakherpora, on Thursday clarified that no private machinery was engaged for snow clearance on the Chelyan-Chontinar road, dismissing claims made in a recently circulated social media video.

In an official report submitted to the Executive Engineer, R&B Division Charar-i-Sharief, a copy of which lies with news agency JKNS the department stated that areas of Bajipathi and Watkuloo do not fall under the jurisdiction of R&B Division Charar-i-Sharief, whereas Chelyan-Chontinar comes within its administrative control.

Related posts

Man Dies After Coming Under Snow Slide In North Kashmir’s Handwara

Forest Department Employee Dies of Heart Attack at Doodhpathri, Srinagar Mourns Loss

23/06/2026
Man Dies After Coming Under Snow Slide In North Kashmir’s Handwara

Elderly Woman Dies of Electrocution in Naidkadal Srinagar

22/06/2026

The report said that from the very first day of snowfall, beginning the intervening night of January 22 and 23, 2026, the sub-division deployed five departmental machines for snow clearance on the Kanidajan-Darwan-Chelyan-Chontinar main road, spanning a length of 10.5 kilometres, along with its allied links. This included two replacement machines deployed on the morning of January 23.

According to the report, one machine was deployed from the Chelyan-Chontinar side, while the remaining machines operated from the Kanidajan side.

The department noted that snow clearance operations were challenging and time-consuming due to heavy snowfall, rooftop snow accumulation, and landslides in the area.

Categorically rejecting the allegations, the Assistant Executive Engineer clarified that no private machinery was used and that all snow clearance work to date has been carried out solely through machines deployed by departmental snow stage contractors.

The report has been submitted for further perusal and record. (JKNS)

Previous Post

Republic Day Celebrations Reflect Unity, Discipline and National Pride: LG Manoj Sinha

Next Post

Global Media and Leaders Hail India–EU FTA

Tanveer Hussain

Tanveer Hussain

Related Posts

Man Dies After Coming Under Snow Slide In North Kashmir’s Handwara
Kashmir

Forest Department Employee Dies of Heart Attack at Doodhpathri, Srinagar Mourns Loss

by Tanveer Hussain
23/06/2026
0

  Srinagar, Jun 23 (JKNS): A wave of grief swept through the Maloora area of Srinagar on Monday following the...

Read more
Man Dies After Coming Under Snow Slide In North Kashmir’s Handwara

Elderly Woman Dies of Electrocution in Naidkadal Srinagar

22/06/2026
Man Dies After Coming Under Snow Slide In North Kashmir’s Handwara

Missing Shopian Youth Found Dead in Vishow Nallah

22/06/2026
Girl drowns in Kishanganga river while collecting firewood, rescue operation underway

Two-Year-Old Girl Dies After Falling into Water Tub in Handwara

22/06/2026
No Sporting Ties With Pakistan Until It Respects India’s Sacrifices: NC Minister Satish Sharma

Satish Sharma Inaugurates Faavos Taekwondo Cup at Indoor Stadium Budgam

20/06/2026
Next Post
Global Media and Leaders Hail India–EU FTA

Global Media and Leaders Hail India–EU FTA

  • About us
  • Contact
  • Our Team
  • Advertise
  • Careers
  • Privacy Policy
e-mail: [email protected]

© 2022 Gadyal - Designed and Developed by GITS.

No Result
View All Result
  • Home
  • Kashmir
  • Jammu
  • World
  • National
  • Sports
  • Article
  • ePaper

© 2022 Gadyal - Designed and Developed by GITS.