Sunday, August 30, 2026
  • About us
  • Contact
  • Our Team
  • Advertise
  • Careers
  • Privacy Policy
Gadyal Kashmir
  • Home
  • Kashmir
  • Jammu
  • World
  • National
  • Sports
  • Article
  • ePaper
No Result
View All Result
Gadyal Kashmir
Home Jammu Kashmir Kashmir

Power Shutdown In Kashmir Parts

Gadyal Desk by Gadyal Desk
16/05/2025
A A
FacebookTwitterWhatsappTelegram

Related posts

Anantnag Police Arrests Drug Peddler, Charas Recovered

Anantnag Police Arrests Drug Peddler, Charas Recovered

29/08/2026
Grand Milad-un-Nabi ﷺ Rally Organised by Kulyatul Sultania in Budgam

Grand Milad-un-Nabi ﷺ Rally Organised by Kulyatul Sultania in Budgam

28/08/2026

Srinagar: According to the Chief Engineer, Distribution, KPDCL, in order to carry out Branch cutting/ pruning of trees lying in the close vicinity of line, shutdown of 33KV Cheshma shahi Centaur Buchwara line shall be observed due to which 33/11KV Receiving Stations at Buchwara and BB Cant. shall remain off while power supply to Nehru Park, Dalgate, Dal, CEN01 (Zabarwan) and adjoining areas besides BB Cant Tap Line will be affected from 10:00 AM to 05:00 PM on 18 May, 2025.
Similarly to carry out Branch cutting/ pruning of trees lying in the close vicinity of these lines, the shutdown of 33KV Habbak Hazratbal line shall be observed due to which 33/11KV Receiving Stations at Habak, Hazratbal shall remain off while power supply to Hazratbal, Umer Colony, Rangpora, BARC, Habak, KU, Nigeen, Kanitar, NIT, Hazratbal shrine and adjoining areas will be affected from 10:00 AM to 05:00 PM on 18 May, 2025.
Also in this connection, the shutdown of 33KV GIS Nowshera BAMK line shall be observed due to which 33/11KV Receiving Station at BAMK shall remain off while power supply to Raja Colony, BAMK Industries, Zadibal, Alamgari Bazar, Bota Kadal, Gilli Kadal and adjoining areas will be affected from 11:00 AM to 03:00 PM on 25 May, 2025.
Further to facilitate evacuation of power from GIS Harwan, the shutdown of 33KV Burzhama Tap line shall be observed due to which 33/11KV Receiving Station at Burzhama shall remain off while power supply to Danihama, Khimber, Chatterhama, Telbal, Burzhama, Gassu, Shopperbagh, Rahbagh, Batpora and adjoining areas will be affected from 10:00 AM to 05:00 PM on 18, 20 & 22 May, 2025.
Moreover to carry out branch cutting and necessary stabilization works, the shutdown of 33KV Uri line shall be observed due to which 33/11KV Receiving Stations at Salamabad, Bandi, Mohura, Noorkah shall remain off while power supply to Salamabad, Bandi, Mohura, Noorkah and adjoining areas will be affected from 10:00 AM to 03:00 PM on 24 & 27 May, 2025.
Also in this connection, the shutdown of 33KV Boniyar line shall be observed due to which 33/11KV Receiving Stations at Boniyar, Nowshera shall remain off while power supply to Boniyar, Nowshera and adjoining areas will be affected from 10:00 AM to 03:00 PM on 19 & 22 May, 2025.
The shutdown of 33KV SIDCO line shall be observed due to which 33/11KV Receiving Stations at Rohama, Chakloo, MID, Irrigation, Seer shall remain off while power supply to Rohama, Chakloo, MID, Irrigation, Seer and adjoining areas will be affected from 10:00 AM to 03:00 PM on 24 May, 2025.
The shutdown of 33KV Malpora line shall be observed due to which 33/11KV Receiving Stations at Chandoosa, Malpora, Gantamulla, Sultanpora shall remain off while power supply to Chandoosa, Malpora, Gantamulla, Sultanpora and adjoining areas will be affected from 10:00 AM to 03:00 PM on 20 May, 2025.
Additionally to facilitate shifting of electrical utilities along the road, the shutdown of 33KV Badampora Wangipora Tap line shall be observed due to which 33/11KV Receiving Stations at Batwina, Wangipora, Nowgam shall remain off while power supply to Batwina, Nowgam, Wangipora, Zazna, Ahan, Waskura, Kharbagh, Sumbal, Nesbal and adjoining areas will be affected from 10:00 AM to 04:00 PM on 17, 20 & 24 May, 2025.
Also in this connection, the shutdown of 33KV Badampora Army Hakbara line shall be observed due to which 33/11KV Receiving Stations at Hakbara, Hajin, Madwan, Army shall remain off while power supply to Hajin, Preng, Madwan, Banyari, Hakbara, Chandergeer and adjoining areas will be affected from 10:00 AM to 04:00 PM on 17, 20 & 24 May, 2025.

Previous Post

DC G’bal visits Baltal Base Camp, reviews preparations for Amarnath Yatra

Next Post

Dharti Aaba Abhiyan set to be unveiled across Tribal villages of Shopian

Gadyal Desk

Gadyal Desk

Related Posts

Anantnag Police Arrests Drug Peddler, Charas Recovered
Kashmir

Anantnag Police Arrests Drug Peddler, Charas Recovered

by Gadyal Desk
29/08/2026
0

Anantnag, Aug 29 (JKNS): Continuing its action against drug trafficking, Anantnag Police apprehended a person during routine patrolling at Haji...

Read more
Grand Milad-un-Nabi ﷺ Rally Organised by Kulyatul Sultania in Budgam

Grand Milad-un-Nabi ﷺ Rally Organised by Kulyatul Sultania in Budgam

28/08/2026
Grand Milad-un-Nabi Rally and Wiladat-e-Prophet Programme Held at Isgandarpora Imambara, Beerwah

Grand Milad-un-Nabi Rally and Wiladat-e-Prophet Programme Held at Isgandarpora Imambara, Beerwah

28/08/2026
Hundreds Attend Holy Relic Display at Khushaal Sahib, Khanyar

Hundreds Attend Holy Relic Display at Khushaal Sahib, Khanyar

28/08/2026
AK-47, Grenades, IED Recovered During CASO in Sopore

AK-47, Grenades, IED Recovered During CASO in Sopore

25/08/2026
Next Post

Dharti Aaba Abhiyan set to be unveiled across Tribal villages of Shopian

  • About us
  • Contact
  • Our Team
  • Advertise
  • Careers
  • Privacy Policy
e-mail: [email protected]

© 2022 Gadyal - Designed and Developed by GITS.

No Result
View All Result
  • Home
  • Kashmir
  • Jammu
  • World
  • National
  • Sports
  • Article
  • ePaper

© 2022 Gadyal - Designed and Developed by GITS.