Sunday, May 25, 2025
  • Contact
  • About us
  • Advertise
  • Careers
  • Privacy Policy
Gadyal Kashmir
  • Home
  • Kashmir
  • Jammu
  • World
  • National
  • Sports
  • Article
  • ePaper
No Result
View All Result
Gadyal Kashmir
Home Latest News

Countdown begins for ISRO’s GSAT-N2, a maiden mission from SpaceX’s Falcon rocket

Agencies by Agencies
18/11/2024
A A
Countdown begins for ISRO’s GSAT-N2, a maiden mission from SpaceX’s Falcon rocket
FacebookTwitterWhatsappTelegram

Chennai: The countdown for ISRO’s first ever rocket mission from Elon Musk-owned SpaceX’s Falcon -9 rocket to launch its advanced communication satellite 4,700 kg GSAT-N2 into

a Geosynchronous Transfer Orbit (GTO) began on Monday morning.

Related posts

CM Bringing Governance to Doorstep, Rumours Around Aga Ruhullah Baseless: NC’s Tanvir Sadiq

CM Bringing Governance to Doorstep, Rumours Around Aga Ruhullah Baseless: NC’s Tanvir Sadiq

25/05/2025

Non-Local Worker Electrocuted to Death at Aribagh Nowgam

25/05/2025

ISRO till now has been relying on Ariane Rocket for its heavy weight GSAT launches from Kourou in French Guyana.

Since it has stopped launching sequences, it has now tied up SpaceX by the Indian government’s New Space India Limited (NSIL) for this commercial launch.

According to SpaceX, the countdown has begun and propellant filling operations has started.

SpaceX Launch Director verifies go for propellant load, it said.

The rocket will lift off from Space Launch Complex 40 (SLC-40) at Cape Canaveral Space Force Station in Florida, US today evening (India-US time difference of 1030 hrs) or tomorrow morning depending upon the window availability as SpaceX has kept its option open for two windows.

It was planned today and If needed, a backup opportunity is available on Tuesday, November 19 during a two-hour window that opens at 4:33 a.m. ET, SpaceX said in its website.

This will be the 19th flight for the Falcon 9 first stage booster supporting this mission, which previously launched SES-22, ispace’s HAKUTO-R MISSION 1, Amazonas-6, CRS-27,

Bandwagon-1, and 13 Starlink missions.

After stage separation, the first stage will land on the Just Read the Instructions droneship, which

will be stationed in the Atlantic Ocean.

GSAT-20 (also known as CMS-03 or GSAT-N2) is a communication satellite, ISRO said.

Though ISRO’s LMV-3 which has the capacity to launch satellites weighing up to 4,000 kg into the GTO, the Indian Space Agency chose to launch it using SpaceX’s Falcon-9 launch vehicle from US, as it weighed 4,700 kg.

This will be ISRO’s first commercial launch using SpaceX.

The GSAT-20, funded, owned and operated by NSIL, will be a continuation of GSAT series of communication satellites and is intended to add data transmission capacity to the communication infrastructure required by Smart Cities Mission of India.

The entire capacity onboard CMS-02 satellite will be leased to Dish TV.

GSAT-N2 (GSAT-20) is a Ka-band High throughput communication satellite of NewSpace India Limited (NSIL), a Government of India company under the Department of Space and the commercial arm of ISRO. GSAT-N2 is the 2nd Demand Driven satellite of NSIL.

GSAT-N2 is set to enhance broadband services and in-flight connectivity (IFC) across the Indian region.

This satellite, featuring multiple spot beams and wideband Ka x Ka transponders, aims to support a large subscriber base with small user terminals, significantly boosting system throughput through its multi-beam architecture which allows frequency reuse.

GSAT-N2, with a lift-off mass of 4700 kg, has a mission life of 14 years.

The satellite is equipped with 32 user beams, comprising 8 narrow spot beams over the Northeast region and 24 wide spot beams over the rest of India. These 32 beams will be supported by hub stations located within mainland India. The Ka-Band HTS communication payload provides a throughput of approximately 48 Gbps.

The payload consists of three parabolic 2.5-meter deployable reflectors with multiple feeds generating 32 spot beams over the Indian region using a single feed per beam configuration.

The GSAT-N2 spacecraft structure is based on the standard Carbon Fiber Reinforced Polymer (CFRP)-based I4K bus. GSAT-N2 is compatible with all major launch vehicles. The thermal control configuration includes both active elements, such as heat pipes and heaters, and passive elements, like multi-layer insulation (MLI) blankets, optical solar reflectors (OSR), thermal paints, and coatings, as used in earlier missions.

The Solar Array deployment mechanisms on the North and South sides of the spacecraft are used

for the deployment of N&S Solar arrays. Each Ka-band antenna is equipped with Deployment and Pointing mechanisms for in-orbit deployment and precise pointing of the antennae.

The propulsion system of GSAT-N2 is configured with a unified bi-propellant chemical propulsion system employing MON3 as oxidizer and MMH as fuel. GSAT-N2’s power system is a single fully regulated 70V bus, consisting of solar panels for power generation, Li-Ion batteries for energy

storage and peak load support, and power electronics for power conditioning and distribution.

The electrical power system is designed to meet a power requirement of approximately 6 kW.

The Attitude and Orbit Control System (AOCS) uses a body-stabilized, momentum-biased system with momentum/reaction wheels to provide a stable platform for communication. Together with the propulsion subsystem, AOCS offers the capability of 3-axis attitude control using thrusters in the transfer orbit as well as orbit raising and fine orbit corrections.

The satellite carries a Sun Sensor, Earth Sensor, Inertial Reference Unit (IRU), and Star Sensor.

All sensors provide attitude data in the form of absolute attitude, while the IRU provides attitude

rates and incremental angles about all the axes.

UNI

Agencies
Previous Post

Govt to Establish Canoeing, Kayaking Institution at Manasbal Lake, Says Advisor to CM

Next Post

Renovation of historic Jawahar Tunnel nears completion with modern upgrades

Related Posts

CM Bringing Governance to Doorstep, Rumours Around Aga Ruhullah Baseless: NC’s Tanvir Sadiq
Latest News

CM Bringing Governance to Doorstep, Rumours Around Aga Ruhullah Baseless: NC’s Tanvir Sadiq

by Gadyal Desk
25/05/2025
0

Srinagar, May 25 (JKNS): National Conference (NC) chief spokesperson and MLA Zadibal Tanvir Sadiq on Sunday said that Chief Minister...

Read more

Non-Local Worker Electrocuted to Death at Aribagh Nowgam

25/05/2025
Final electoral rolls likely to be published tomorrow

ECI convenes National Conference of Counsels and CEOs to strengthen and reorient its legal framework

25/05/2025

In Berlin, EAM called on new German Chancellor Friedrich Merz, held talks with FM Wadephul

25/05/2025

NITI Aayog meeting is another “exercise in hypocrisy and diversion”, alleges Jairam

25/05/2025
Next Post
Renovation of historic Jawahar Tunnel nears completion with modern upgrades

Renovation of historic Jawahar Tunnel nears completion with modern upgrades

  • Contact
  • About us
  • Advertise
  • Careers
  • Privacy Policy
e-mail: [email protected]

© 2022 Gadyal - Designed and Developed by GITS.

No Result
View All Result
  • Home
  • Kashmir
  • Jammu
  • World
  • National
  • Sports
  • Article
  • ePaper

© 2022 Gadyal - Designed and Developed by GITS.