Monday, July 13, 2026
  • About us
  • Contact
  • Our Team
  • Advertise
  • Careers
  • Privacy Policy
Gadyal Kashmir
  • Home
  • Kashmir
  • Jammu
  • World
  • National
  • Sports
  • Article
  • ePaper
No Result
View All Result
Gadyal Kashmir
Home Jammu Kashmir

Monitor progress on River Morphology studies on daily basis: CEO ERA asks officers

Gadyal Desk by Gadyal Desk
15/02/2024
A A
FacebookTwitterWhatsappTelegram

Reviews progress on sub projects under Jhelum Tawi Flood Recovery Project

SRINAGAR, FEBRUARY 15: Chief Executive Officer, Jammu and Kashmir Economic Reconstruction Agency (ERA), Dr. Syed Sehrish Asgar, today asked the officers to effectively monitor progress on Jhelum and Tawi river basin morphological studies being undertaken as part of World Bank funded Jhelum Tawi Flood Recovery Project on daily basis to ensure earliest completion of critical studies.

Related posts

CPI(M) Urges Action Against Harassment of Kashmiris After Pahalgam Attack

CPI(M) Says Unity, Sustained Struggle Only Way Forward for Restoration of Democratic Rights in J&K

13/07/2026
Former Cooperative MD Convicted for Forging Date of Birth to Extend Service Tenure: EOW Kashmir

Wanted Serial Fraudster with 11 Criminal Cases Arrested by EOW Kashmir, Sent to Central Jail

13/07/2026

Dr Syed Sehrish Asgar said this while chairing a meeting held to review progress on ongoing World Bank funded JTFRP at Civil Secretariat, Srinagar here today

She gave instructions for close monitoring of progress of work on all the remaining under execution sub-projects under JTFRP particularly the flagship sub-projects of construction of Emergency Operations Centre at Ompura, Budgam, construction of Additional Hospital block at Bone and Joints Hospital, Barzulla and construction of extension block at Lal Ded Hospital, Srinagar.

Director, Technical, JTFRP, Gurcharan Singh, while giving details regarding preparation of feasibility and detailed project report for flood mitigation and comprehensive river management measures for Jhelum river basin, informed that the concerned stakeholders had asked for some clarifications which have been incorporated in the model and final observations from Central Water Commission are awaited. With regard to preparation of feasibility and detailed project report for flood mitigation and comprehensive river management of Tawi basin, he said that some clarifications have been raised by the concerned stakeholders which have been incorporated and further a joint site visit was conducted with the I&FC Jammu for on spot inspection.

The CEO asked the Director Technical, JTFRP, to closely follow up both the studies with the I&FC Department so that both the studies are finalised and completed at earliest.

Dr Sehrish was informed that progress of work on upgradation of 47 dewatering stations in Srinagar city is in progress with work already completed on 40 stations while as work on remaining stations is underway.

She asked the Director, Technical, JTFRP to follow-up all impediments hindering progress of work on the sub-project and concerned PIU be asked to give firm date for the completion of the sub-project.

Nodal officer for construction of additional hospital building at Bone and Joints hospital, Barzulla informed that work on the sub-project is at the advanced stage. He said that estimates for construction of corridor from existing hospital to new block and other additional works has been submitted to World Bank for approval.

Dr. Sehrish asked Director, Technical, and JTFRP to personally follow-up the matter with World Bank and other stakeholders to ensure the work on the sub-project is not affected and continues unhindered. It was also informed that work on construction of state of art EOC (Emergency Operations Centre) at Ompura Budgam is underway and designs for some mechanical components have been submitted to World bank for approval.

Nodal officer for various sub-projects being executed by J&KERA as PIU (project implementation unit) in Kashmir Division informed that work on Hamray-Sultanpora road sub-project has been completed and project handed over to R&B. Besides, work on the construction of Waghama-Bijbehara road subproject is underway with excavation and construction of diversion in progress.

The CEO directed the concerned nodal officer to ensure that work on the said sub-project is completed by June, 2024.

With regard to progress on various bridge sub-projects being executed by J&KERA in Kashmir division, it was informed by the concerned nodal officer that work on construction of Rohmoo bridge in Pulwama, is in full swing with one deck slab already laid and preparation for laying of 2nd deck slab presently underway alongwith the construction of approaches. Further, work on construction of approaches and pedestal for the bearings on Trenz bridge is in progress.

It was also informed that R&B, which is PIU (project implementation unit) for the sub-projects, has conveyed that estimates for construction of Waza Mohalla, Shrakawara, Wahdina and Wagila bridges are in the final stages and shall be tendered as soon as technical sanction from the Chief Engineer, (R&B) is obtained and works will be tendered out within 10 days.

Further, it was informed that final drawings for construction of extension block at lal Ded Hospital are being reviewed by R&B and tenders for the sub-project will be issued in March,2023.

The CEO asked the Director, Technical JTFRP to take up the matter of the constitution of a committee for procurement of medical equipments for the new facility with the principal Government Medical College on priority.

Nodal Officers for various road upgradation sub-projects being executed by J&KERA in Jammu division, informed that work on Devi Mai Ohli-Mandir road sub-project has been completed and road thrown open for traffic and handover takeover process of the sub-project is in process. Besides, road upgradation for Gulati-Shahdra Sharief road sub-project has been upgraded except for laying of B.T which will be taken up during the forthcoming working season. It was also informed that DPR and estimates for Tutan Di Khuie road sub-project have been prepared and submitted to World bank and tenders for the work will be floated as soon as approval from the World Bank is obtained.

Among others the meeting was attended by Chief Accounts Officer, J&KERA/JTFRP, Additional Secretary legal, ERA, Project Manager, Transport, ERA, Jammu, Deputy Project Manager, Transport, Jammu, Project Manager, Transport, ERA, Kashmir, Deputy Project Manager, ERA Transport, Deputy Project Manager, ERA Transport, Deputy Project Manager, Deputy Project Manager, ERA Transport and other senior officers of ERA and JTFRP.

Previous Post

Lt Governor inaugurates ‘New J&K-New Hope’ Cultural Festival in Jammu

Next Post

GDC Kulgam organizes Webinar on ‘Major reforms in Accreditation of Higher Education Institutions’

Gadyal Desk

Gadyal Desk

Related Posts

CPI(M) Urges Action Against Harassment of Kashmiris After Pahalgam Attack
Jammu Kashmir

CPI(M) Says Unity, Sustained Struggle Only Way Forward for Restoration of Democratic Rights in J&K

by Gadyal Desk
13/07/2026
0

Srinagar, July 13 (JKNS): The Communist Party of India (Marxist) on Monday said that unity of the people and sustained...

Read more
Former Cooperative MD Convicted for Forging Date of Birth to Extend Service Tenure: EOW Kashmir

Wanted Serial Fraudster with 11 Criminal Cases Arrested by EOW Kashmir, Sent to Central Jail

13/07/2026
BJP Defamation Notice a ‘Love Letter’: CM Omar Abdullah Says Party Chose Courts Over Political Debate

1931 Movement Was Against Oppression, Not a Religious Struggle, Will Continue to Honour July 13 Martyrs”: CM Omar Abdullah

13/07/2026
BJP Defamation Notice a ‘Love Letter’: CM Omar Abdullah Says Party Chose Courts Over Political Debate

BJP Defamation Notice a ‘Love Letter’: CM Omar Abdullah Says Party Chose Courts Over Political Debate

13/07/2026
Cyber Police Awantipora Recovers Over ₹5.3 Lakh, Intensifies Crackdown on Online Financial Frauds

Cyber Expert Warns of Phishing Campaign on X, Urges Users to Avoid Fake Voting Links

13/07/2026
Next Post
GDC Kulgam organizes Webinar on ‘Major reforms in Accreditation of Higher Education Institutions’

GDC Kulgam organizes Webinar on ‘Major reforms in Accreditation of Higher Education Institutions’

  • About us
  • Contact
  • Our Team
  • Advertise
  • Careers
  • Privacy Policy
e-mail: [email protected]

© 2022 Gadyal - Designed and Developed by GITS.

No Result
View All Result
  • Home
  • Kashmir
  • Jammu
  • World
  • National
  • Sports
  • Article
  • ePaper

© 2022 Gadyal - Designed and Developed by GITS.