Sunday, August 23, 2026
  • About us
  • Contact
  • Our Team
  • Advertise
  • Careers
  • Privacy Policy
Gadyal Kashmir
  • Home
  • Kashmir
  • Jammu
  • World
  • National
  • Sports
  • Article
  • ePaper
No Result
View All Result
Gadyal Kashmir
Home Jammu Kashmir

Div Com takes holistic review of Winter preparedness in Kashmir

Gadyal Desk by Gadyal Desk
25/12/2023
A A
Div Com takes holistic review of Winter preparedness in Kashmir
FacebookTwitterWhatsappTelegram

 

 

Related posts

Uri Accident : Two more succumbs toll 10

Two Injured in Road Accident at Chakloo Baramulla, One Critical

22/08/2026
Psy-STEM Project Marks Major First-Phase Milestone at GCW M.A. Road

Psy-STEM Project Marks Major First-Phase Milestone at GCW M.A. Road

22/08/2026

SRINAGAR, DECEMBER 25: The Divisional Commissioner (Div Com) Kashmir, Vijay Kumar Bidhuri Monday convened a meeting to take holistic review of winter preparedness of all the departments in Kashmir.

 

The meeting was attended by Deputy Commissioners (DCs) of Baramulla, Anantnag, Bandipora, Budgam and Shopian, Director Food Civil Supplies and Consumer Affairs (FCS&CA), Director Health Services Kashmir, Chief Engineer Mech and Hosp Engineering, Chief Engineers of R&B North and South Kashmir, C.E IOCL North, besides representatives of other DCs, KPDCL and PHE etc.

 

The chair reviewed department wise preparedness for winters to ensure smooth supply of essentials viz. ration, water, electricity, and medical care, besides timely road clearance to ensure smooth movement of vehicles etc.

 

Taking stock of supply position of essentials in snow bound areas that remain cut-off during winters; the Director FCS&CA informed the meeting that there is no dearth of fuel in Kashmir and they have maintained sufficient stocks of it in snow bound areas, besides they have also made 100% stocks of ration at such places.

 

Officer from KPDCL informed the chair that the department is maintaining the curtailment programme while there are no distress cuts since additional 200 MWs of power. He further informed that they are providing round the clock power supply to 22 Feeders where both smart metering and cabling has been done, and in addition they are extending the facility to more 8 to 10 Feeders.

 

In case of replacement of Damaged Distribution Transformers (DDTs), the Officer informed that in urban areas they are placing the DDTs within 48 hrs while in rural areas the exercise is completed within 1-2 days.

 

The Div Com directed the KPDCL authorities to ensure damaged DTs are replaced within timeframe as per the directions of Lt. Governor and common masses do not have to face any difficulty.

 

He also directed to keep man and material ready to meet any exigency in case of heavy snowfall besides take stringent action against hooking.

 

The Director Health Services briefed the chair regarding deployment of 15 numbers of 4*4 vehicles in far-flung areas. He also assured that there is sufficient availability of Doctors and Medicines in Kashmir Hospitals especially those that remain cut-off during winters.

 

The Div Com directed the Health Services Authorities to ensure night staff remains available in hospitals to cater emergency cases. Besides, he also directed him to conduct inspections to ensure availability of doctors and other paramedical staff in hospitals.

 

Upgrading its number of machines from 252 in last year to 282 machines this year to undertake snow clearance, the Chief Engineer Mech and Hosp Engineering informed that in addition to increasing the number of machinery they have established 11 units across Kashmir to ensure timely snow clearance on roads.

 

He further informed that they have also dumped fuel in Gurez and other snow bound areas to meet the demand and therefore are ready to meet any exigency.

 

Regarding road clearance measures in South Kashmir, the Chief Engineer R&B South informed the meeting they have made 350 machines available to cater road clearance besides man and material stands in place to meet any eventuality.

 

He further informed that they have tendered all 139 stages which also remain allotted.

 

The Chief Engineer R&B North informed the meeting that 126 stages have been tendered while 114 have been allotted so far, the remaining 12 stages shall be allotted shortly.

 

Officer from PHE also informed the meeting that they have all their schemes running properly supplying water smoothly to all the areas.

Previous Post

VBSY: People pledge to promote PM’s vision at Khour

Next Post

Kulgam truck driver dies, as truck hits vehicles on Mumbai-Agra highway

Gadyal Desk

Gadyal Desk

Related Posts

Uri Accident : Two more succumbs toll 10
Jammu Kashmir

Two Injured in Road Accident at Chakloo Baramulla, One Critical

by Gadyal Desk
22/08/2026
0

Srinagar, Aug 22 (JKNS): Two persons were injured in a road accident on the National Highway at Chakloo near Yawar...

Read more
Psy-STEM Project Marks Major First-Phase Milestone at GCW M.A. Road

Psy-STEM Project Marks Major First-Phase Milestone at GCW M.A. Road

22/08/2026
J&K Govt Prioritizes Infrastructure, No Current Proposal to Upgrade Schools

Big 16% Surge in J&K College Admissions: Govt

22/08/2026
NC Government Betrays People Again: Free Power Promise Turns Into 6.83% Tariff Hike: LoP Sunil Sharma

NC Government Betrays People Again: Free Power Promise Turns Into 6.83% Tariff Hike: LoP Sunil Sharma

22/08/2026
MLA Beerwah Reviews R&B Works, Hails Performance; Inaugurates Macadamised Kalipora–Lalpora Road

MLA Beerwah Reviews R&B Works, Hails Performance; Inaugurates Macadamised Kalipora–Lalpora Road

22/08/2026
Next Post
Kulgam truck driver dies, as truck hits vehicles on Mumbai-Agra highway

Kulgam truck driver dies, as truck hits vehicles on Mumbai-Agra highway

  • About us
  • Contact
  • Our Team
  • Advertise
  • Careers
  • Privacy Policy
e-mail: [email protected]

© 2022 Gadyal - Designed and Developed by GITS.

No Result
View All Result
  • Home
  • Kashmir
  • Jammu
  • World
  • National
  • Sports
  • Article
  • ePaper

© 2022 Gadyal - Designed and Developed by GITS.