Sunday, August 23, 2026
  • About us
  • Contact
  • Our Team
  • Advertise
  • Careers
  • Privacy Policy
Gadyal Kashmir
  • Home
  • Kashmir
  • Jammu
  • World
  • National
  • Sports
  • Article
  • ePaper
No Result
View All Result
Gadyal Kashmir
Home Jammu Kashmir Kashmir

DC Kulgam reviews progress of RDD sector in district

Instructs Officers to ensure timely completion of ongoing works

Gadyal Desk by Gadyal Desk
02/02/2023
A A
DC Kulgam reviews progress of RDD sector in district
FacebookTwitterWhatsappTelegram

KULGAM, FEBRUARY 02: The Deputy Commissioner (DC) Kulgam, Dr. Bilal Mohi-Ud-Din Bhat today convened a meeting of all concerned officers of Rural Development Department (RDD) to review the progress of ongoing developmental works under various Rural Development schemes.

The DC reviewed work wise status of developmental works and other schemes and received updated status and feedback from the officers.

Related posts

Man Dies After Coming Under Snow Slide In North Kashmir’s Handwara

76-Year-Old Non-Local Man Found Dead Inside Hanuman Temple in Srinagar

22/08/2026
SCW Kashmir Searches Police Constable’s House in Forged DOB, Qualification Appointment Case

SCW Kashmir Searches Police Constable’s House in Forged DOB, Qualification Appointment Case

21/08/2026

Addressing the meeting, the DC directed the officers to work with added dedication to accelerate the developmental tempo and ensure completion of all ongoing works within the stipulated time frame.

He gave timelines for completion of different developmental works and directed the BDOs to ensure field visits for proper inspection.

Reviewing the status of works under 14th FC, the chair was informed that out of 6883 approved works, 6380 works stands completed with an expenditure of 67.78 crore.

While reviewing work status of Back to village phase 03, it was given out that there were 279 approved works, 242 works stands completed with an expenditure of 14.02 crore.

The DC while reviewing the status of developmental works being carried out under Area Development Fund (ADF), it was informed that out of 1883 total works, 1600 works have been completed so far with an expenditure of Rs. 20.51 crore.

The DC exhorted upon the officers to ensure completion of all ongoing works within the set timeframe by utilizing the rest of the working season properly.

He also instructed BDOs to complete citizen app registration of SBM beneficiaries within 2 days.

The meeting was attended by Additional District Development Commissioner, Showkat Ahmad Rather; ACR, Mir Imtiyaz-ul-Aziz; ACD, Mohammad Imran Khan; ACP, Shurjeel Ali; Ex. Engineer REW, Block Development officers and other concerned from Rural Development Department.

NO: PR/DDI/SGR/23/5970/

Previous Post

J&K LCMA celebrated ‘World Wetland Day’ 

Next Post

Atal Dulloo asks departments to expedite onboarding of schemes on MyScheme portal 

Gadyal Desk

Gadyal Desk

Related Posts

Man Dies After Coming Under Snow Slide In North Kashmir’s Handwara
Latest News

76-Year-Old Non-Local Man Found Dead Inside Hanuman Temple in Srinagar

by Gadyal Desk
22/08/2026
0

Srinagar, Aug 22 (JKNS): A 76-year-old non-local man was found unconscious inside a Hanuman Temple in the Amira Kadal area...

Read more
SCW Kashmir Searches Police Constable’s House in Forged DOB, Qualification Appointment Case

SCW Kashmir Searches Police Constable’s House in Forged DOB, Qualification Appointment Case

21/08/2026
JDI Kashmir Condoles Demise of Director Information’s Grandmother

Director SKIMS, Staff Expresses Condolence on Demise of BMO Hajin’s Father

20/08/2026

Zainapora SDM Orders Removal of Road Obstructions, Warns of Legal Action

20/08/2026
Girl drowns in Kishanganga river while collecting firewood, rescue operation underway

Father Drowns While Trying to Save Son at Nussu Badragund

19/08/2026
Next Post
Atal Dulloo asks departments to expedite onboarding of schemes on MyScheme portal 

Atal Dulloo asks departments to expedite onboarding of schemes on MyScheme portal 

  • About us
  • Contact
  • Our Team
  • Advertise
  • Careers
  • Privacy Policy
e-mail: [email protected]

© 2022 Gadyal - Designed and Developed by GITS.

No Result
View All Result
  • Home
  • Kashmir
  • Jammu
  • World
  • National
  • Sports
  • Article
  • ePaper

© 2022 Gadyal - Designed and Developed by GITS.