Saturday, September 12, 2026
  • About us
  • Contact
  • Our Team
  • Advertise
  • Careers
  • Privacy Policy
Gadyal Kashmir
  • Home
  • Kashmir
  • Jammu
  • World
  • National
  • Sports
  • Article
  • ePaper
No Result
View All Result
Gadyal Kashmir
Home Home

DC Srinagar inspects progress of ongoing works at Bakshi Stadium

Gadyal Desk by Gadyal Desk
28/07/2022
A A
DC Srinagar inspects progress of ongoing works at Bakshi Stadium
FacebookTwitterWhatsappTelegram

SRINAGAR, JULY 28: The Deputy Commissioner (DC) Srinagar, Mohammad Aijaz Asad Thursday visited Bakshi Stadium and inspected progress of the ongoing renovation and upgradation works there that are at the final stage of completion.

The DC took a round of the Stadium to inspect the dewatering being carried out to drain out the accumulated water in the stadium caused due to heavy rains. He asked the City drainage Division to deploy additional dewatering pumps.

Related posts

‘Don’t Force Us to Stop Water Supply’: Casual Workers’ Forum Warns Govt

‘Don’t Force Us to Stop Water Supply’: Casual Workers’ Forum Warns Govt

11/09/2026
PM Modi Presents Russian Translation of Thirukkural to Putin, Holds Talks on Strengthening India-Russia Ties

PM Modi Presents Russian Translation of Thirukkural to Putin, Holds Talks on Strengthening India-Russia Ties

11/09/2026

On the occasion, Executive Engineer City Drainage demonstrated the Drainage Network connectivity Plan and its implementation for the Stadium.

The DC also took stock of the upgradation works of power supply and asked the concerned to complete the works within the set timeline. He further asked them to ensure proper backup supply at the Stadium to tackle any unavoidable interruption in the main power supply.

Pertinent to mention that, Bakshi Stadium is one of the major Stadium in Srinagar City being built on the norms of FIFA with the facility of night sports and has undergone massive renovation with execution of several upgradation works by the National Project Construction Corporation Limited at an estimated cost of Rs 40.85 crore.

The State of Art Sports facility has come up with central Funding and shall prove a game changer for the aspirational sports persons looking to make a mark at National/International level.

Previous Post

Director Information reviews functioning of Division office Jammu

Next Post

DDC Shopian reviews District Capex Budget 2022-23, PRI Grants

Gadyal Desk

Gadyal Desk

Related Posts

‘Don’t Force Us to Stop Water Supply’: Casual Workers’ Forum Warns Govt
Kashmir

‘Don’t Force Us to Stop Water Supply’: Casual Workers’ Forum Warns Govt

by Gadyal Desk
11/09/2026
0

  Srinagar, Sept 11 (JKNS): The Jammu and Kashmir Casual/Daily Wagers Forum (JKCDF) on Friday held a peaceful protest at...

Read more
PM Modi Presents Russian Translation of Thirukkural to Putin, Holds Talks on Strengthening India-Russia Ties

PM Modi Presents Russian Translation of Thirukkural to Putin, Holds Talks on Strengthening India-Russia Ties

11/09/2026
Alyas Ahmad Naisroo Assumes Charge as CEO, GDA

Alyas Ahmad Naisroo Assumes Charge as CEO, GDA

11/09/2026
Uri Accident : Two more succumbs toll 10

Two Killed, Three Injured As Baleno Car Meets With Accident In Kathua’s Sarthal

11/09/2026
Girl drowns in Kishanganga river while collecting firewood, rescue operation underway

13-Year-Old Boy Drowns In Madumati Nallah While Trying To Retrieve Ball

10/09/2026
Next Post
DDC Shopian  reviews  District Capex Budget 2022-23, PRI Grants

DDC Shopian reviews District Capex Budget 2022-23, PRI Grants

  • About us
  • Contact
  • Our Team
  • Advertise
  • Careers
  • Privacy Policy
e-mail: [email protected]

© 2022 Gadyal - Designed and Developed by GITS.

No Result
View All Result
  • Home
  • Kashmir
  • Jammu
  • World
  • National
  • Sports
  • Article
  • ePaper

© 2022 Gadyal - Designed and Developed by GITS.