Monday, May 12, 2025
  • Contact
  • About us
  • Advertise
  • Careers
  • Privacy Policy
Gadyal Kashmir
  • Home
  • Kashmir
  • Jammu
  • World
  • National
  • Sports
  • Article
  • ePaper
No Result
View All Result
Gadyal Kashmir
Home Jammu Kashmir

USBRL Project: Trial run of electric train between Banihal-Khari stations conducted successfully

Gadyal Desk by Gadyal Desk
05/12/2023
A A
USBRL Project: Trial run of electric train between Banihal-Khari stations conducted successfully

October-1, 2022-SRINAGAR: A view of Kashmirýs first electric train reaches Kashmir, The Jammu and Kashmir Government and Indian Railway and Indian Railway Construction Limited have been working together on this project since August 2019.J&K Government and Indian Railwayýs decided to operating Kashmirýs first electric train for 137 ýKilometer long Between Baramulla to Banihal on 2 October 2022, in Srinagar on Saturday 1 October 2022. Photo/Mohammad Amin War

FacebookTwitterWhatsappTelegram

Banihal, Dec 05: The Northern Railways here have conducted a successful trial run of an electric train for the first time from Banihal Railway Station to Railway Station Khari in Ramban district on Tuesday.

A Northern Railway official told that the first 15-kilometres electric train trial run was conducted from Banihal Railway Station to Railway Station Khari in Ramban district.

Related posts

Life limping back to normalcy along LoC as ceasefire holds

Life limping back to normalcy along LoC as ceasefire holds

12/05/2025
LG’s upcoming visit to Baramulla; DC chairs preparatory meeting

DC Baramulla conducts extensive visit of Uri; reviews relief measures for shelling affected people

12/05/2025

He said senior officers and engineers from Northern Railway, along with officials from the Indian Railway Construction International Limited (IRCON), were present on the occasion.

“The stretch is part of the 111-km-long Banihal-Katra section of the Udhampur-Srinagar-Baramulla-Rail-Link (USBRL) project,” official said.

“Work is underway as Sumber station is now being linked with Sangaldan station. We expect that trains will soon operate on the Katra-Banihal section,” he added—(KNO).

Gadyal Desk
Gadyal Desk
Previous Post

GENERAL MANAGER REVIEWS PERFORMANCE OF NORTHERN RAILWAY . Reviews Winter Arrangements, Safety and infrastructure work,Focus on Safety on tracks, Focus on Punctuality

Next Post

Secretary holds interactive session with Maharashtra Tour Organisers Association, tourism stakeholders in Katra

Related Posts

Life limping back to normalcy along LoC as ceasefire holds
Kashmir

Life limping back to normalcy along LoC as ceasefire holds

by Gadyal Desk
12/05/2025
0

Srinagar: Life is slowly limping back to normal in border areas of Kashmir, as no firing was reported from any...

Read more
LG’s upcoming visit to Baramulla; DC chairs preparatory meeting

DC Baramulla conducts extensive visit of Uri; reviews relief measures for shelling affected people

12/05/2025
DC Kupwara Reviews Snow Clearance and Power Restoration Amid Heavy Snowfall, Urges Caution on Border Roads.

DC Kupwara visits Karnah, takes stock of situation

12/05/2025

DC Poonch visits areas affected by ceasefire violation, directs damage assessment

12/05/2025
Ganderbal Police observes “Thana Diwas”; SSP Ganderbal chairs the event

Ganderbal Police observes “Thana Diwas”; SSP Ganderbal chairs the event

11/05/2025
Next Post
Secretary holds interactive session with Maharashtra Tour Organisers Association, tourism stakeholders in Katra

Secretary holds interactive session with Maharashtra Tour Organisers Association, tourism stakeholders in Katra

  • Contact
  • About us
  • Advertise
  • Careers
  • Privacy Policy
e-mail: [email protected]

© 2022 Gadyal - Designed and Developed by GITS.

No Result
View All Result
  • Home
  • Kashmir
  • Jammu
  • World
  • National
  • Sports
  • Article
  • ePaper

© 2022 Gadyal - Designed and Developed by GITS.