Tuesday, June 23, 2026
  • About us
  • Contact
  • Our Team
  • Advertise
  • Careers
  • Privacy Policy
Gadyal Kashmir
  • Home
  • Kashmir
  • Jammu
  • World
  • National
  • Sports
  • Article
  • ePaper
No Result
View All Result
Gadyal Kashmir
Home Jammu Kashmir Kashmir

ADC Ganderbal inspects work progress on Wayil Bridge

Directs executing agency to expedite work

Gadyal Desk by Gadyal Desk
11/01/2023
A A
ADC Ganderbal inspects work progress on Wayil Bridge
FacebookTwitterWhatsappTelegram

GANDERBAL, DECEMBER 12: Additional Deputy Commissioner Ganderbal visited the under construction Wayil Bridge to inspect the progress of work.

During the visit the ADC was accompanied by Executive Engineer, R&B , I&FC Tehsildar Lar amd Ganderbal along with patwaries concerned and officials of NHAI officials.

Related posts

Man Dies After Coming Under Snow Slide In North Kashmir’s Handwara

Teen Found Dead at Home in Noorbagh Srinagar

23/06/2026
Anand Jain, Appointed as DGP Ladakh

Anand Jain, Appointed as DGP Ladakh

23/06/2026

On the occasion the Additional Deputy Commissioner Ganderbal complemented the R&B (Executing Agency) for launching Arch Truss Griders type Bridge in a short span period time adding that such unique type designs works will be taken in future.

The Executive Engineer R&B Ganderbal informed that the bridge has an arch type steel girder with well foundation design with span 110 meters and width 10.50 meters besides, length of approach roads is 330 meters.

Keeping in view the importance of this prestigious project, the Additional Deputy Commissioner Ganderbal directed the executing agency to expedite the work progress so that it gets completed within a given timeline. Further Executive Engineer R&B informed that the Total cost of bridge is Rs 23.79 Crores under JTRF and after the completion the bridge will be first of its kind in the valley and will be thrown open to the general public at the end January, 2023.

Executing agency informed Additional Deputy Commissioner Ganderbal that the work on the approaches is underway and the approaches will be completed in the month of April, 2023.

Speaking on the occasion the Additional Deputy Commissioner directed the R&B Department to expedite the work so that the general public does not face any inconvenience.

He congratulated the Executing agency that the launching of arch truss is a historic moment and was long pending demand of General public.

Previous Post

Indian Army Soldiers Evacuate Pregnant Lady In North Kashmir’s Boniyar Near LoC

Next Post

DC B’la reviews Arrangements for Khelo-India Winter Games 

Gadyal Desk

Gadyal Desk

Related Posts

Man Dies After Coming Under Snow Slide In North Kashmir’s Handwara
Latest News

Teen Found Dead at Home in Noorbagh Srinagar

by Gadyal Desk
23/06/2026
0

Srinagar, June 23 (JKNS): A 17-year-old boy was found dead inside his residence in the Noorbagh area of Srinagar, officials...

Read more
Anand Jain, Appointed as DGP Ladakh

Anand Jain, Appointed as DGP Ladakh

23/06/2026
Mera Yuva Bharat Baramulla Organises International Yoga Day Programme at Hajin, Bandipora

Mera Yuva Bharat Baramulla Organises International Yoga Day Programme at Hajin, Bandipora

23/06/2026
Man Dies After Coming Under Snow Slide In North Kashmir’s Handwara

10-Year-Old Girl Dies While Playing on Rooftop in Bijbehara

22/06/2026
Man Dies After Coming Under Snow Slide In North Kashmir’s Handwara

Elderly Woman Dies of Electrocution in Naidkadal Srinagar

22/06/2026
Next Post
DC B’la reviews Arrangements for Khelo-India Winter Games 

DC B’la reviews Arrangements for Khelo-India Winter Games 

  • About us
  • Contact
  • Our Team
  • Advertise
  • Careers
  • Privacy Policy
e-mail: [email protected]

© 2022 Gadyal - Designed and Developed by GITS.

No Result
View All Result
  • Home
  • Kashmir
  • Jammu
  • World
  • National
  • Sports
  • Article
  • ePaper

© 2022 Gadyal - Designed and Developed by GITS.