Thursday, July 23, 2026
  • About us
  • Contact
  • Our Team
  • Advertise
  • Careers
  • Privacy Policy
Gadyal Kashmir
  • Home
  • Kashmir
  • Jammu
  • World
  • National
  • Sports
  • Article
  • ePaper
No Result
View All Result
Gadyal Kashmir
Home Jammu Kashmir Kashmir

ACB Books Former PWD Engineer, Files Chargesheet in Bribery Case

Gadyal Desk by Gadyal Desk
21/04/2026
A A
ACB Arrests SPO for Accepting Rs 5,000 Bribe at GMC Jammu Police Post
FacebookTwitterWhatsappTelegram

Jammu, Apr 21 (JKNS): The Anti-Corruption Bureau (ACB) J&K on Tuesday filed a charge-sheet against a former Assistant Executive Engineer of PWD (R&B) Sopore for allegedly demanding and accepting bribe from a contractor for clearing pending bills.

In a statement issued here to news agency JKNS reads, ACB J&K, has presented a charge sheet before the Hon’ble Court of Special Judge, Anti-Corruption Baramulla, against Mubarak Ahmad Ganai, then Assistant Executive Engineer (AEE), PWD (R&B) Division Sopore, in a case involving demand and acceptance of illegal gratification from a contractor for processing payment of bills.

Related posts

Man Dies After Coming Under Snow Slide In North Kashmir’s Handwara

Policeman Killed in Exchange of Fire in Anantnag

22/07/2026
One Dead, Dozens of Shops Damaged as Flash Floods Ravage Beerwah in Budgam

One Dead, Dozens of Shops Damaged as Flash Floods Ravage Beerwah in Budgam

21/07/2026

The case originated from a complaint lodged by a contractor alleging that the accused demanded a bribe @ 2% for processing the bill amounting to ₹28.27 lakh, pertaining to the construction of a classroom lecture block at Government Degree College Sopore. Discreet verification substantiated the allegations, leading to registration of a case under Section 7 of the Prevention of Corruption Act, 1988, and laying of a trap, it reads.

On 16.10.2024, the accused Mubarak Ahmad Ganai, AEE was caught red-handed while demanding and accepting a bribe of ₹25,000 from the complainant, it reads.

Statement further reads that, The tainted amount was recovered from his possession in the presence of independent witnesses. Investigation conducted revealed that the accused, by virtue of his official position, had direct authority over processing of the pending bill and had deliberately withheld the same to extract illegal gratification from contractor/complainant.

Upon completion of investigation, the case was placed before the competent authority, which, after due application of mind, accorded sanction for prosecution against accused AEE, after which Final report /challan was presented before competent court by the agency, it reads.

The matter now stands placed before the Hon’ble Court for judicial determination. The next date has been fixed on 6th June, 2026. The Anti-Corruption Bureau remains steadfast in its mandate to enforce accountability and ensure that abuse of public office is met with firm legal action, statement reads. (JKNS)

Previous Post

Strengthen Trauma Care, Ensure Swift Emergency Response: Satish Sharma at GMC Udhampur

Next Post

Youth Take Lead as Hardapanzo Hosts Inter-School Cross Country Run

Gadyal Desk

Gadyal Desk

Related Posts

Man Dies After Coming Under Snow Slide In North Kashmir’s Handwara
Kashmir

Policeman Killed in Exchange of Fire in Anantnag

by Gadyal Desk
22/07/2026
0

Anantnag, July 22 (JKNS): A police personnel was killed during a brief exchange of fire between security forces and terrorists...

Read more
One Dead, Dozens of Shops Damaged as Flash Floods Ravage Beerwah in Budgam

One Dead, Dozens of Shops Damaged as Flash Floods Ravage Beerwah in Budgam

21/07/2026
BSF Foils Infiltration Bid Along IB in Jammu, Pakistani National Apprehended in Khour Sector

BSF Foils Infiltration Bid Along IB in Jammu, Pakistani National Apprehended in Khour Sector

21/07/2026
SMC Launches City-Wide Drainage Action Plan, Constitutes Zone-Wise Task Forces to Combat Waterlogging

SMC Launches City-Wide Drainage Action Plan, Constitutes Zone-Wise Task Forces to Combat Waterlogging

21/07/2026
Community Welcomes Umer Malik Academy as New Hub for Taekwondo and Youth Development

Community Welcomes Umer Malik Academy as New Hub for Taekwondo and Youth Development

20/07/2026
Next Post
Youth Take Lead as Hardapanzo Hosts Inter-School Cross Country Run

Youth Take Lead as Hardapanzo Hosts Inter-School Cross Country Run

  • About us
  • Contact
  • Our Team
  • Advertise
  • Careers
  • Privacy Policy
e-mail: [email protected]

© 2022 Gadyal - Designed and Developed by GITS.

No Result
View All Result
  • Home
  • Kashmir
  • Jammu
  • World
  • National
  • Sports
  • Article
  • ePaper

© 2022 Gadyal - Designed and Developed by GITS.