Saturday, September 19, 2026
  • About us
  • Contact
  • Our Team
  • Advertise
  • Careers
  • Privacy Policy
Gadyal Kashmir
  • Home
  • Kashmir
  • Jammu
  • World
  • National
  • Sports
  • Article
  • ePaper
No Result
View All Result
Gadyal Kashmir
Home Jammu Kashmir Jammu

Chadoora Bridge Closure Forces Locals to Risky Daily Crossings Through River

Week-long repair promise stretches into months, residents allege apathy

Gadyal Desk by Gadyal Desk
14/01/2026
A A
Chadoora Bridge Closure Forces Locals to Risky Daily Crossings Through River
FacebookTwitterWhatsappTelegram

Srinagar, Jan 14 (JKNS): The prolonged closure of the Chadoora bridge in central Kashmir’s Budgam district has compelled residents to take dangerous daily routes through a river channel, as authorities fail to restore the vital link even two months after its shutdown.

The bridge, a key connector between Chadoora, Charar-i-Sharif, Yousmarg and Pulwama, was closed in late November after it suffered structural damage during floods and was declared unsafe for traffic. Officials had initially assured that repair work would be completed within a week.

Related posts

Motorcyclist Killed, Another Injured In Road Accident At Botingoo Sopore

Motorcyclist Killed, Another Injured In Road Accident At Botingoo Sopore

19/09/2026
Sufi Tahir Joins NHM Employees’ Protest, Urges Govt to Address Pending Demands

Sufi Tahir Joins NHM Employees’ Protest, Urges Govt to Address Pending Demands

18/09/2026

However, the delay has left thousands of commuters with no option but to cross the shallow yet risky riverbed on foot and on two-wheelers, exposing them to potential accidents amid freezing temperatures and unstable terrain.

Visuals accessed by news agency JKNS show people navigating muddy and rocky patches of the river channel, using it as an alternative passage in the absence of any temporary arrangement.

“We have no choice but to cross through the river every day,” said a local resident. “Taking another route means walking several extra kilometres. Despite repeated pleas, no official has visited the area to assess our situation.”

Residents said the prolonged closure has severely affected patients, students and traders, for whom the bridge is an essential lifeline.

“The administration had promised reopening within days. Two months have passed, but there is no visible repair work. After fencing off the bridge, they seem to have forgotten us,” another commuter said.

Officials had earlier stated that the bridge would be reopened only after technical clearance from competent authorities. However, locals allege that repair activity has remained stalled since the closure.

Notably, the bridge was shut down after an inspection by experts from the DIQC, Srinagar, who found that floodwaters had displaced the base of one of the bridge pillars, rendering the structure unsafe for vehicular movement and necessitating urgent repairs. (JKNS)

Previous Post

Govt, Private Schools Share Merit as Pass Percentage Stands at 84.02 in Class 12 Results

Next Post

Rakesh Aggarwal Appointed Director General of NIA

Gadyal Desk

Gadyal Desk

Related Posts

Motorcyclist Killed, Another Injured In Road Accident At Botingoo Sopore
Kashmir

Motorcyclist Killed, Another Injured In Road Accident At Botingoo Sopore

by Gadyal Desk
19/09/2026
0

Sopore, Sep 19 (JKNS): One motorcyclist was killed while another sustained injuries after their motorcycle collided with a Tata Matador...

Read more
Sufi Tahir Joins NHM Employees’ Protest, Urges Govt to Address Pending Demands

Sufi Tahir Joins NHM Employees’ Protest, Urges Govt to Address Pending Demands

18/09/2026
Anantnag Police Arrests Three Drug Peddlers, Charas Recovered

Anantnag Police Arrests Three Drug Peddlers, Charas Recovered

18/09/2026
Shopian Police Attach ₹16.56 Lakh House, Freeze ₹4.73 Lakh Cash In Drug Proceeds Case

Shopian Police Attach ₹16.56 Lakh House, Freeze ₹4.73 Lakh Cash In Drug Proceeds Case

18/09/2026
Former Cooperative MD Convicted for Forging Date of Birth to Extend Service Tenure: EOW Kashmir

EOW Kashmir Arrests Fraudster In ₹93 Lakh Land, Property Fraud Case

18/09/2026
Next Post
Rakesh Aggarwal Appointed Director General of NIA

Rakesh Aggarwal Appointed Director General of NIA

  • About us
  • Contact
  • Our Team
  • Advertise
  • Careers
  • Privacy Policy
e-mail: [email protected]

© 2022 Gadyal - Designed and Developed by GITS.

No Result
View All Result
  • Home
  • Kashmir
  • Jammu
  • World
  • National
  • Sports
  • Article
  • ePaper

© 2022 Gadyal - Designed and Developed by GITS.