Tuesday, July 8, 2025
  • Contact
  • About us
  • Advertise
  • Careers
  • Privacy Policy
Gadyal Kashmir
  • Home
  • Kashmir
  • Jammu
  • World
  • National
  • Sports
  • Article
  • ePaper
No Result
View All Result
Gadyal Kashmir
Home Jammu Kashmir

DC Kulgam reviews progress of RDSS works

Gadyal Desk by Gadyal Desk
09/08/2024
A A
DC Kulgam reviews progress of RDSS works
FacebookTwitterWhatsappTelegram

Related posts

Girl drowns in Kishanganga river while collecting firewood, rescue operation underway

Body of Teenager Recovered Two Days After Drowning in Jhelum River at Baramulla

08/07/2025
Sakeena Itoo reviews progress on SAMAGRA Shiksha interventions across J&K

Govt to establish MRI, Cath Lab worth Rs 37.50 cr in GMC Baramulla this year: Sakeena Itoo

08/07/2025

KULGAM, AUGUST 09: To review the status of ongoing works under the Revamped Distribution Sector Scheme (RDSS) in the district, a meeting was today chaired by the Deputy Commissioner (DC) Kulgam, Athar Aamir Khan at Mini-secretariat, here.
During the meeting, the Chief Manager of POWERGRID briefed the chair on the project’s progress.
All stakeholders were directed to adhere to the instructions of the chair and coordinate with the executing agency to ensure the successful completion of this prestigious project.
The RDSS, with a project cost of Rs 126.9 crore, aims to strengthen the power distribution infrastructure in Kulgam by installing 900 new distribution transformers and laying 500 km of Low Tension Aerial Bunched Cables (LT ABC). This will significantly reduce Aggregate Technical and Commercial (AT&C) losses in the district.
The meeting was attended by ADDC, Bashir Ahmad Wani; ACR, Mushtaq Ahmad Lone; Tehsildars, representatives from POWERGRID, KPDCL, PMGSY and other departments.

Gadyal Desk
Gadyal Desk
Previous Post

Director Ayush reviews functioning of Deptt in Bandipora

Next Post

Lt Governor performs Pujan of Shri Amarnathji Chhari Mubarak

Related Posts

Girl drowns in Kishanganga river while collecting firewood, rescue operation underway
Kashmir

Body of Teenager Recovered Two Days After Drowning in Jhelum River at Baramulla

by Gadyal Desk
08/07/2025
0

Baramulla, July 8 (JKNS): The body of a teenage boy who drowned while bathing two days ago in the Jhelum...

Read more
Sakeena Itoo reviews progress on SAMAGRA Shiksha interventions across J&K

Govt to establish MRI, Cath Lab worth Rs 37.50 cr in GMC Baramulla this year: Sakeena Itoo

08/07/2025
DC Kupwara Reviews Snow Clearance and Power Restoration Amid Heavy Snowfall, Urges Caution on Border Roads.

DC Kupwara reviews progress of Poshan schemes

08/07/2025
DC Kulgam reviews arrangements for Urs of Hazrat Mir Syed Ali Simnani (RA)

DC Kulgam takes review of Mission YUVA; assesses implementation, progress

08/07/2025
Lt Governor attends ET’s Women Conclave 2024

Delegation of Gurdwara Prabandhak Committee, Distt B’la led by its Prez calls on LG

08/07/2025
Next Post
Lt Governor performs Pujan of Shri Amarnathji Chhari Mubarak

Lt Governor performs Pujan of Shri Amarnathji Chhari Mubarak

  • Contact
  • About us
  • Advertise
  • Careers
  • Privacy Policy
e-mail: [email protected]

© 2022 Gadyal - Designed and Developed by GITS.

No Result
View All Result
  • Home
  • Kashmir
  • Jammu
  • World
  • National
  • Sports
  • Article
  • ePaper

© 2022 Gadyal - Designed and Developed by GITS.