Saturday, July 5, 2025
  • Contact
  • About us
  • Advertise
  • Careers
  • Privacy Policy
Gadyal Kashmir
  • Home
  • Kashmir
  • Jammu
  • World
  • National
  • Sports
  • Article
  • ePaper
No Result
View All Result
Gadyal Kashmir
Home Jammu Kashmir

Successful trial through Khari-Sumber section raises hope of completion of Kashmir Rail Link Project

Gadyal Desk by Gadyal Desk
26/01/2024
A A
Successful trial through Khari-Sumber section raises hope of completion of Kashmir Rail Link Project
FacebookTwitterWhatsappTelegram

Jammu, Jan 26: On the eve of Republic Day, a video shared by the Minister for Railways, Communications, Electronics, and Information Technology, Ashwini Vaishnaw, on his personal social media account rekindled hope of the early completion of the dream project of directly connecting Kashmir Valley with the rest of the country through trains.

The completion of the ambitious Udhampur-Srinagar-Baramulla Rail Link (USBRL) project would pave the way for taking the train directly to Kashmir from Udhampur.

Related posts

JKL High Court Slams Illegal High Court Bar Association Srinagar’s PIL, Cites ‘No Legal Legs to Stand On’

HC Rejects Plea to Quash FIR in ARTO Anantnag Fake License Scam

05/07/2025
DC Sgr inaugurates inter-zonal competitions at indoor stadium

DC B’gam conducts spot assessment of Ashura arrangements at Beheshte Zehra Park

05/07/2025

“Trials Successful: EMU runs through Bharat’s longest transportation tunnel (13 km)!!! Khari-Sumber section, Jammu & Kashmir”, the Railways Minister posted while sharing a video of an engine smoothly running on the tracks.

As per Railway officials, after the successful trial of the EMU train through the longest transportation tunnel on the Khari-Sumber section, the Udhampur-Baramulla section is set to be extended until Sumber now.

On January 3, the Commissioner of Railways Safety (CRS) conducted the second round of statutory inspections between Banihal and Khari along the USBRL project.

The Khari railway station, situated in Jammu and Kashmir’s Ramban district, falls between Banihal and Katra on the remaining 111-kilometer stretch of the USBRL project, set to connect Kashmir with the rest of the country by train in the coming months.

Trial runs on the Banihal-Khari Section were conducted in December

On December 6, 2023, Northern Railways successfully conducted the first trial run of an electric train from Banihal to Khari, bringing joy to the local population in the remote, picturesque area.
The 16-km Banihal-Khari segment forms part of the 111-km-long final phase of the USBRL project, connecting Banihal to Katra.

Engineers of Ircon International Limited, engaged by Northern Railway for the USBRL Project, informed that the 25 KV railway electrification (ROCS) work between Banihal and Khari stations was completed.

Additionally, the first trial run of an electric engine with six coaches was also successfully conducted by the Northern Railway Firozpur division.

272-km USBRL was declared a “national project”

The 272-km Udhampur-Srinagar-Baramulla Rail Link aims to connect Kashmir Valley with the rest of the country by a broad-gauge railway line.

In view of the importance of the USBRL in providing seamless and hassle-free connectivity to Kashmir, it was declared as a “National Project” in 2002.

Out of the total 272 km USBRL project, the first phase of the 118-km Qazigund-Baramulla section was commissioned in October 2009, followed by the 18-km Banihal-Qazigund in June 2013 and 25-km Udhampur-Katra in July 2014.

The USBRL project, initiated in 1997, represents one of the most challenging railway infrastructure projects post-independence, facing multiple delays and cost escalations.–(Agencies)

Gadyal Desk
Gadyal Desk
Previous Post

J&K Long-Awaited Snowfall breaks dry spell in Kashmir

Next Post

PM Modi greets people on Republic Day

Related Posts

JKL High Court Slams Illegal High Court Bar Association Srinagar’s PIL, Cites ‘No Legal Legs to Stand On’
Kashmir

HC Rejects Plea to Quash FIR in ARTO Anantnag Fake License Scam

by Gadyal Desk
05/07/2025
0

Srinagar, July 5 (JKNS): The High Court of Jammu and Kashmir has refused to quash an FIR against officials of...

Read more
DC Sgr inaugurates inter-zonal competitions at indoor stadium

DC B’gam conducts spot assessment of Ashura arrangements at Beheshte Zehra Park

05/07/2025
Amarnath Yatra Related Series (History/ Preparation)

Amarnath Yatra 2025: Over 6,411 Devotees Set Off from Jammu in Third Batch

04/07/2025
Div Com Kashmir reviews arrangements for Eid Milad-un-Nabi (S.A.W), Friday following

Div Com flags off first batch of SANJY pilgrims from Domail Baltal

04/07/2025
DC Sgr inaugurates inter-zonal competitions at indoor stadium

DC Budgam Reviews Progress on New District Hospital, Critical Care Unit in Reshipora

03/07/2025
Next Post
تجربہ کار سیاسی رہنما اور بہار کے سابق وزیر اعلی جن نائک  کرپوری ٹھاکر کی 100ویں سالگرہ پر وزیر اعظم نریندر مودی کا

PM Modi greets people on Republic Day

  • Contact
  • About us
  • Advertise
  • Careers
  • Privacy Policy
e-mail: [email protected]

© 2022 Gadyal - Designed and Developed by GITS.

No Result
View All Result
  • Home
  • Kashmir
  • Jammu
  • World
  • National
  • Sports
  • Article
  • ePaper

© 2022 Gadyal - Designed and Developed by GITS.