Thursday, May 15, 2025
  • Contact
  • About us
  • Advertise
  • Careers
  • Privacy Policy
Gadyal Kashmir
  • Home
  • Kashmir
  • Jammu
  • World
  • National
  • Sports
  • Article
  • ePaper
No Result
View All Result
Gadyal Kashmir
Home Home

World’s highest railway bridge in J&K will give you goosebumps

Gadyal Desk by Gadyal Desk
09/02/2022
A A
World’s highest railway bridge in J&K will give you goosebumps
FacebookTwitterWhatsappTelegram

New pictures of the World’s Highest Railway Bridge over Chenab are giving goosebumps.

An arch-shaped bridge is 35 meters higher than the Eiffel Tower in France

Related posts

India’s Solodarity with people POJK

وادی کشمیر میں وقف اثاثوں کی صحیح نگرانی اور ترقی ناگزیر

19/04/2025

پاکستانی پروپیگنڈا وزیرِ اعظم نریندر مودی کے دورۂ کشمیر کے دوران: سوشل میڈیا کا تجزیہ

17/01/2025

Union Minister Ashwini Vaishnaw on Monday shared a picture of the arch of the world’s highest railway bridge, the Chenab bridge. “The world’s highest arch Chenab Bridge over the clouds,” he tweeted.

The image features the bridge arching above the clouds with mountains standing tall in the background.

The Chenab bridge, located in Jammu and Kashmir’s Reasi district, is 1,315-metre long and aims to boost connectivity to the Kashmir Valley.

The Chenab bridge holds the distinction of being the highest railway bridge in the world at 359 meters above the river bed level.

Sambit Patra, National Spokesperson of Bharatiya Janata Party also shared images showcasing the bridge arch from various angles.

“What a spectacular picture of the 1315 m long Chenab bridge arch in Reasi, J&K. The bridge is truly an engineering marvel. The bridge will stand at 359m above river bed level and it will be higher than the Eiffel tower. The bridge aims to boost connectivity to Kashmir valley,” he said.

The bridge is part of 110 kilometers long rail line between Katra and Banihal. It is likely to be completed within the next two years. A part of the 272-km Udhampur-Srinagar-Baramulla rail line, the project aims to provide an alternative surface link between Kashmir and the rest of the country. The 53-kilometer-long railway line’s 96% passes through underground tunnels

Construction

This bridge Construction of Bridge involved the fabrication of 28,660 MT steel, 10 Lakh cubic meters (Cum0 Earthwork, 66,000 Cum Concrete, and 26 km motorable roads. The Arch of the bridge consists of steel boxes. Concrete will be filled in boxes of the Arch to improve stability. The overall weight of Arch is 10,619 MT. The total span is 17.

The erection of the members of the arch by overhead cable cranes was done for the first time on Indian Railways. The most sophisticated ‘Tekla’ software is used for structural detailing. Also, the structural steel is suitable for -10°C to 40°C temperature. The cost of the bridge came at Rs 1486 crore.

Features

The bridge is designed to withstand high wind speed up to 266 Km/Hour and will remain operational at a restricted speed of 30 Km/Hour even after the removal of one pier/trestle.

The bridge was designed for blast load in consultation with DRDO for the first time in India. The bridge is designed to bear earthquake forces of highest intensity zone-V in India.

For the first time in Indian Railways, a Phased Array Ultrasonic Testing machine was used for testing welds. Approximately 584Km welding was done to join the different parts of the structure, which is to the tune of the distance between Jammu Tawi to New Delhi.

Also, the height of the cable crane’s pylon at Srinagar End is 127m, which is much taller than Qutub Minar of 72m.

Gadyal Desk
Gadyal Desk
Previous Post

India logs 71,365 new COVID cases, 1,217 fresh fatalities

Next Post

Premier League: Burnley hold Man Utd to draw, Newcastle defeat Everton

Related Posts

India’s Solodarity with people POJK
Home

وادی کشمیر میں وقف اثاثوں کی صحیح نگرانی اور ترقی ناگزیر

by Gadyal Desk
19/04/2025
0

وقف املاک نہ کسی مذہبی لیڈر کی ملکیت ہوتی ہے اور ناہی کسی خاص انجمن کی ملکیت ہے بلکہ یہ...

Read more

پاکستانی پروپیگنڈا وزیرِ اعظم نریندر مودی کے دورۂ کشمیر کے دوران: سوشل میڈیا کا تجزیہ

17/01/2025
THE CALL OF THE MOUNTAINS NORTH KASHMIR’S NEW FRONTIERS FOR ADVENTURE SEEKERS

گریز وادی کشمیر کی تہذیب اور کلچر کی پہنچان

09/01/2025
قاضی سلمان کو ڈائریکٹر، پی آئی بی سرینگر کے بطور ترقی سے نوازا گیا

قاضی سلمان کو ڈائریکٹر، پی آئی بی سرینگر کے بطور ترقی سے نوازا گیا

09/01/2025
بانڈی پورہ میں عوام کی بہادری: زخمی فوجیوں کی مدد سے کشمیریت کی مثال قائم

بانڈی پورہ میں عوام کی بہادری: زخمی فوجیوں کی مدد سے کشمیریت کی مثال قائم

05/01/2025
Next Post
Premier League: Burnley hold Man Utd to draw, Newcastle defeat Everton

Premier League: Burnley hold Man Utd to draw, Newcastle defeat Everton

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

  • Contact
  • About us
  • Advertise
  • Careers
  • Privacy Policy
e-mail: [email protected]

© 2022 Gadyal - Designed and Developed by GITS.

No Result
View All Result
  • Home
  • Kashmir
  • Jammu
  • World
  • National
  • Sports
  • Article
  • ePaper

© 2022 Gadyal - Designed and Developed by GITS.