Monday, June 9, 2025
  • Contact
  • About us
  • Advertise
  • Careers
  • Privacy Policy
Gadyal Kashmir
  • Home
  • Kashmir
  • Jammu
  • World
  • National
  • Sports
  • Article
  • ePaper
No Result
View All Result
Gadyal Kashmir
Home Home

DC Srinagar holds meeting for follow up of the directions of LG for completion of 500-bedded Covid Hospital at Khanmoh

Gadyal Desk by Gadyal Desk
01/06/2021
A A
DC Srinagar holds meeting for follow up of the directions of LG for completion of 500-bedded Covid Hospital at Khanmoh
FacebookTwitterWhatsappTelegram

SRINAGAR,  JUNE 01:- Deputy Commissioner Srinagar, Mohammad Aijaz Asad today chaired a meeting of concerned officers to sort out all the issues to ensure completion of 500-bedded COVID CARE Hospital at Khonmoh within the deadline set by the Lieutenant Governor during his recent visit at the work site in Khonmoh.

Chief Engineer, KPDCL, Ajaz Ahmad Dar, Medical Superintendent of the Hospital, Chief Planning Officer, Srinagar, besides concerned Officers from DRDO, PHE, PDD, FCS&CA, Revenue were present in the meeting

Related posts

India’s Solodarity with people POJK

وادی کشمیر میں وقف اثاثوں کی صحیح نگرانی اور ترقی ناگزیر

19/04/2025

پاکستانی پروپیگنڈا وزیرِ اعظم نریندر مودی کے دورۂ کشمیر کے دوران: سوشل میڈیا کا تجزیہ

17/01/2025

During the  review the project Incharge from DRDO  apprised the meeting that work is in full swing and expected to be completed shortly.

The DC asked the officers to take comprehensive measures to ensure that all requisite staff, medical supplies, equipment, diagnostic tools, and other logistics are ready within the timeline.

The DC directed for  taking all necessary measures with regard to Housekeeping, Laundry,  disposal of Bio-medical and other wastes. He also directed the installation of a fire fighting system at the hospital.

To ensure adequate water supply to the hospital,  the DC asked the Ground Water Division to dig up a dedicated Bore Well in the hospital premises within two days.

The Deputy Commissioner also passed the directions that SMC would ensure Sanitation and Sanitization in and around the hospital.

The DC Srinagar reiterated that the operationalization of DRDO’s Hospital  at Khonmoh would further strengthen efforts against Covid pandemic,

On the occasion, the Chief Engineer KPDCL assured that all possible measures have been taken to ensure reliable and uninterrupted supply of power in the hospital round the clock.

The Medical Superintendent of the hospital also put forth some suggestions for better functioning of the hospital.

Pertinent to mention that the Covid Hospital, Khonmoh has capacity for 125 ICU beds and 375 beds with oxygen and substantially will increase the Covid dedicated bed capacity to ramp up the healthcare infrastructure to effectively deal with the Corona virus pandemic.

In the end DC enjoined upon all the Departments to work in double shifts to meet the deadline fixed by the Lieutenant Governor. He assured DRDO of all support to achieve the intended target.

Gadyal Desk
Gadyal Desk
Previous Post

Lt Governor visits Anantnag, reviews Covid containment & preventive measures in the district

Next Post

10 more Receiving Stations to be completed by next month

Related Posts

India’s Solodarity with people POJK
Home

وادی کشمیر میں وقف اثاثوں کی صحیح نگرانی اور ترقی ناگزیر

by Gadyal Desk
19/04/2025
0

وقف املاک نہ کسی مذہبی لیڈر کی ملکیت ہوتی ہے اور ناہی کسی خاص انجمن کی ملکیت ہے بلکہ یہ...

Read more

پاکستانی پروپیگنڈا وزیرِ اعظم نریندر مودی کے دورۂ کشمیر کے دوران: سوشل میڈیا کا تجزیہ

17/01/2025
THE CALL OF THE MOUNTAINS NORTH KASHMIR’S NEW FRONTIERS FOR ADVENTURE SEEKERS

گریز وادی کشمیر کی تہذیب اور کلچر کی پہنچان

09/01/2025
قاضی سلمان کو ڈائریکٹر، پی آئی بی سرینگر کے بطور ترقی سے نوازا گیا

قاضی سلمان کو ڈائریکٹر، پی آئی بی سرینگر کے بطور ترقی سے نوازا گیا

09/01/2025
بانڈی پورہ میں عوام کی بہادری: زخمی فوجیوں کی مدد سے کشمیریت کی مثال قائم

بانڈی پورہ میں عوام کی بہادری: زخمی فوجیوں کی مدد سے کشمیریت کی مثال قائم

05/01/2025
Next Post
10 more Receiving Stations to be completed by next month

10 more Receiving Stations to be completed by next month

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

  • Contact
  • About us
  • Advertise
  • Careers
  • Privacy Policy
e-mail: [email protected]

© 2022 Gadyal - Designed and Developed by GITS.

No Result
View All Result
  • Home
  • Kashmir
  • Jammu
  • World
  • National
  • Sports
  • Article
  • ePaper

© 2022 Gadyal - Designed and Developed by GITS.