Tuesday, July 1, 2025
  • Contact
  • About us
  • Advertise
  • Careers
  • Privacy Policy
Gadyal Kashmir
  • Home
  • Kashmir
  • Jammu
  • World
  • National
  • Sports
  • Article
  • ePaper
No Result
View All Result
Gadyal Kashmir
Home Home

MD KPDCL conducts day long tour of various Sites, Divisions

Gadyal Desk by Gadyal Desk
25/04/2021
A A
MD KPDCL conducts day long tour of various Sites, Divisions
FacebookTwitterWhatsappTelegram

Reviews progress of works, functioning of divisions

SRINAGAR, APRIL 25: The Managing Director (MD) Kashmir Power Distribution Corporation Limited (KPDCL), Dr Basharat Qayoom today conducted a day long tour of various sites and divisions to review their functioning.

Related posts

India’s Solodarity with people POJK

وادی کشمیر میں وقف اثاثوں کی صحیح نگرانی اور ترقی ناگزیر

19/04/2025

پاکستانی پروپیگنڈا وزیرِ اعظم نریندر مودی کے دورۂ کشمیر کے دوران: سوشل میڈیا کا تجزیہ

17/01/2025

The MD visited Central workshop Division Pampore, Electric Central Store Division Pampore and under construction Receiving station located at Shar Pulwama.

During the visit to Electric Workshop Division Pampore, the Executive Engineer apprised the MD about the frequency of damaged transformers received in the division on a daily basis and the position of Buffer Stock available.

The MD asked the concerned Executive Engineer to utilise the entire available manpower to repair the transformers in the shortest possible time. Further he directed the Ex. Engineer to maintain sufficient buffer stock including Power transformers so that the same becomes ready for use in case of any urgent situation.

He further stressed upon strengthening the Central workshop Division so that dependence on SSI units becomes negligible.

He also visited Electric Central Store Division Pampore and took stock of the material present including ST Poles, PCC Poles, ACSR Conductor, Transformer Oil, Transformers and other allied material.

Later, the MD visited Receiving Station Shar and reviewed the progress of work that started February last year.

The concerned Executive Engineer STD Pulwama informed the MD about the progress made till now in the construction of 6.3 MVA Receiving station and the timeline for its completion.

The MD stressed upon the Concerned Ex. Engineer to speed up the work so that the Receiving station is commissioned by August 2021.

Meanwhile, the MD KPDCL during the visit was accompanied by Superintending Engineer Circle Ist and other officials of KPDCL.

Gadyal Desk
Gadyal Desk
Previous Post

Chairman DDC visits SDH Kupwara

Next Post

Police arrests 03 persons & seized 08 vehicles for illegal mining and transportation

Related Posts

India’s Solodarity with people POJK
Home

وادی کشمیر میں وقف اثاثوں کی صحیح نگرانی اور ترقی ناگزیر

by Gadyal Desk
19/04/2025
0

وقف املاک نہ کسی مذہبی لیڈر کی ملکیت ہوتی ہے اور ناہی کسی خاص انجمن کی ملکیت ہے بلکہ یہ...

Read more

پاکستانی پروپیگنڈا وزیرِ اعظم نریندر مودی کے دورۂ کشمیر کے دوران: سوشل میڈیا کا تجزیہ

17/01/2025
THE CALL OF THE MOUNTAINS NORTH KASHMIR’S NEW FRONTIERS FOR ADVENTURE SEEKERS

گریز وادی کشمیر کی تہذیب اور کلچر کی پہنچان

09/01/2025
قاضی سلمان کو ڈائریکٹر، پی آئی بی سرینگر کے بطور ترقی سے نوازا گیا

قاضی سلمان کو ڈائریکٹر، پی آئی بی سرینگر کے بطور ترقی سے نوازا گیا

09/01/2025
بانڈی پورہ میں عوام کی بہادری: زخمی فوجیوں کی مدد سے کشمیریت کی مثال قائم

بانڈی پورہ میں عوام کی بہادری: زخمی فوجیوں کی مدد سے کشمیریت کی مثال قائم

05/01/2025
Next Post
Police arrests 03 persons & seized 08 vehicles for illegal mining and transportation

Police arrests 03 persons & seized 08 vehicles for illegal mining and transportation

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

  • Contact
  • About us
  • Advertise
  • Careers
  • Privacy Policy
e-mail: [email protected]

© 2022 Gadyal - Designed and Developed by GITS.

No Result
View All Result
  • Home
  • Kashmir
  • Jammu
  • World
  • National
  • Sports
  • Article
  • ePaper

© 2022 Gadyal - Designed and Developed by GITS.